Monitoring the Session

HB 1174

bill requiring gas capture plans for drilling permits

Died in committee

Verdict: No flags

No flagsInitial review
Rep. Gina HinojosaDHouse 49

Initial review · graded Oct 20, 2026 · Headline, summary and grade are analysis of the bill text, not a finding about any person · How we grade

Caption

relating to a requirement that an applicant for a permit to drill an oil or gas well submit a gas capture plan for the well.

Caption from analyzed text · version I.

Summary

No plan to minimize flaring, no permit.

The bill bars the Railroad Commission from issuing a permit to drill, deepen, plug back, or reenter an oil or gas well unless the applicant files a gas capture plan to minimize flaring. The plan must list expected gas, oil and condensate volumes, map nearby gathering pipelines and their capacity, lay out a schedule to connect the well, and describe other uses for the gas if the well cannot connect. Starting September 1, 2025, oil and gas operators must do this paperwork for every new permit application, though the bill sets no flaring limit and no penalty for failing to follow the plan.

Labels

Labels: ZOMBIE BILL. Died 2 times: 88R HB 1782 (Died in committee) and this bill (Died in committee). Checked against 88R only.BACK FROM THE DEAD. Same text as a bill filed before that died: 88R HB 1782 (Died in committee). Filed in 2 sessions, counting this one. Checked against 88R only.TRY NO. 2. Filed in 2 sessions: 88R and 89R. Checked against 88R only.NEVER GOT A HEARING. Filed Nov 12, 2024 and referred to the House Energy Resources committee. No public hearing. The bill died.

Receipt

The receipt

89R-HB1174 · 2024-11-12

SOLD BY

ITEM

relating to a requirement that an applicant for a permit to drill an oil or gas well submit a gas capture plan for the well.

WHAT IT DOES

No plan to minimize flaring, no permit.

The bill bars the Railroad Commission from issuing a permit to drill, deepen, plug back, or reenter an oil or gas well unless the applicant files a gas capture plan to minimize flaring. The plan must list expected gas, oil and condensate volumes, map nearby gathering pipelines and their capacity, lay out a schedule to connect the well, and describe other uses for the gas if the well cannot connect. Starting September 1, 2025, oil and gas operators must do this paperwork for every new permit application, though the bill sets no flaring limit and no penalty for failing to follow the plan.

CHARGES

[ ] NONE FOUND

TOTAL

No fiscal note in the loaded record.

HISTORY

  1. Filed
  2. Read first time
  3. Referred to Energy Resources
FILED UNDER

No verified beat found.

No flags

THANK YOU FOR CHECKING THE RECEIPT

CAMPAIGN PAID FOR BY

CAMPAIGN PAID FOR BY

Donors

DSCC$1.49MJay Robert Pritzker$1,200,000DGA Action$1.00M

Not tied to this bill.

Sources

The author's campaign account only. Own money and internal transfers are separate on the member page.

Derived itemized flow · Jul 1, 2024 to Oct 24, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

DSCC$1,485,555.60

DSCC

$1,485,555.60

Cash
$0.00
Paid by others
$1,485,555.60
Total
$1,485,555.60
canvassing $1,467,942.00Other filed descriptions $17,613.60

Also funds 0 other sitting lawmakers.

Derived recipient stock · Oct 2, 2026 to Oct 19, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · Oct 2, 2026 to Oct 19, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073400.

Jay Robert Pritzker$1,200,000.00
DGA Action$1,000,000.00

DGA Action

$1,000,000.00

Cash
$1,000,000.00
Paid by others
$0.00
Total
$1,000,000.00

Also funds 0 other sitting lawmakers.

Derived recipient stock · on Oct 15, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · on Oct 15, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073400.

Money

Missing data does not establish zero giving. Display amounts are rounded.

×

DSCC

$1,485,555.60

Cash
$0.00
Paid by others
$1,485,555.60
Total
$1,485,555.60
canvassing $1,467,942.00Other filed descriptions $17,613.60

Also funds 0 other sitting lawmakers.

Derived recipient stock · Oct 2, 2026 to Oct 19, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · Oct 2, 2026 to Oct 19, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073400.

×

DGA Action

$1,000,000.00

Cash
$1,000,000.00
Paid by others
$0.00
Total
$1,000,000.00

Also funds 0 other sitting lawmakers.

Derived recipient stock · on Oct 15, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · on Oct 15, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073400.

Votes

No floor vote loaded for this bill.

Fiscal

No fiscal note in the loaded record.

How this was graded

Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.

FILED BEFORE

Filed 2 times: 88R and 89R. Checked against 88R only.

88R HB 1782

by Rep. Hinojosa, same lead author · Died in committee · same text

Introduced text

Last action, Mar 7, 2023: Referred to Energy Resources

Relating to a requirement that an applicant for a permit to drill an oil or gas well submit a gas capture plan for the well.

Caption, 88R bill history

Sources

Texas House · Filed Nov 12, 2024

03/07/2025 H Referred to Energy Resources: Mar 7 2025 2:33PM

Texas Legislature Online · Introduced

Data snapshot Oct 26, 2026 at 4:20 AM CDT. Grades, charges, quotes and corrections follow the published record.

House committee · Energy Resources · Final status: Died in committee

Subjects

Environment--Air

Oil & Gas

PERMITS

RAILROAD COMMISSION

Text

The text as introduced · 750 words

By: Hinojosa
H.B. No. 1174

A BILL TO BE ENTITLED

AN ACT

relating to a requirement that an applicant for a permit to drill an

oil or gas well submit a gas capture plan for the well.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Subchapter F, Chapter 86, Natural Resources

Code, is amended by adding Section 86.186 to read as follows:

Sec. 86.186. GAS CAPTURE PLAN. (a) The commission may not

issue a permit to drill, deepen, plug back, or reenter an oil or gas

well unless the applicant submits with the application a gas

capture plan to minimize flaring from the well.

(b) The gas capture plan must include:

(1) the volume of gas anticipated to be produced from

the well annually, measured in thousands of cubic feet;

(2) the volume of oil anticipated to be produced from

the well annually, measured in barrels;

(3) the volume of condensate anticipated to be

produced from the well annually, measured in barrels;

(4) a detailed map depicting each existing, planned,

and anticipated gas gathering system in the general area of the

well;

(5) the following information with regard to the gas

gathering system that the operator of the well has contracted to use

or, if the operator has not entered into a contract, the gas

gathering system that is closest to the well:

(A) the name of the operator of the gas gathering

system;

(B) a description of the approximate route of the

pipeline required to connect the well to the gas gathering system;

(C) the distance in feet of the pipeline required

to connect the well to the gas gathering system;

(D) the volume of gas in thousands of cubic feet

per day that the gas gathering system is capable of transporting;

(E) the volume of gas in thousands of cubic feet

per day that the gas gathering system is currently transporting;

(F) the volume of gas in thousands of cubic feet

per day that the gas gathering system is anticipated to be

transporting on the date of first sale of gas from the well;

(G) the reliability of the gas gathering system,

including the average annual downtime of the system; and

(H) the name and location of the gas processing

plant that receives or is anticipated to receive gas from the gas

gathering system;

(6) any plans for expanding the gas gathering systems

in the general area of the well;

(7) any other issues affecting the gathering of gas in

the general area of the well;

(8) a plan for connecting the well to a gas gathering

system, including:

(A) a description of any potential right-of-way

issues;

(B) the schedule for constructing any necessary

gas gathering facilities;

(C) the date a gas gathering line will be

available;

(D) a statement of whether the gas gathering

system described by Subdivision (5) has the capacity to accept the

volume of gas anticipated to be produced from the well at the time

of application for the permit; and

(E) a description of any discussions the operator

of the well has had with other upstream operators regarding the

construction or availability of a gas gathering line; and

(9) a description of any options available to the

operator of the well for the beneficial use of gas from the well if

the well cannot be connected to a gas gathering system, including:

(A) on-site use of the gas;

(B) the processing of liquids in the gas;

(C) the use of the gas for electric power

generation;

(D) the conversion of the gas to liquid fuels;

(E) the compression of the gas on the lease on

which the well is located;

(F) the reinjection of the gas for underground

storage;

(G) the reinjection of the gas for temporary

storage;

(H) the reinjection of the gas for enhanced oil

recovery; and

(I) shutting in the well, taking into account the

effect of doing so on the reservoir as well as public health,

safety, and the environment.

SECTION 2. The change in law made by this Act applies only

to a permit the application for which is filed with the Railroad

Commission of Texas on or after the effective date of this Act. A

permit the application for which is filed before the effective date

of this Act is subject to the law in effect on the date the

application is filed, and that law is continued in effect for that

purpose.

SECTION 3. This Act takes effect September 1, 2025.