Monitoring the Session

HB 2114

bill barring water plan engineers from building the reservoir

Died in committee

Verdict: No flags

No flagsInitial review
Rep. Gary VanDeaverRHouse 1

Initial review · graded Oct 20, 2026 · Headline, summary and grade are analysis of the bill text, not a finding about any person · How we grade

Caption

relating to the engineering feasibility and construction of a reservoir.

Caption from analyzed text · version I.

Summary

Helped write the plan or feasibility study? You can’t build it.

The bill bars any engineering firm that was hired to help write the state water plan, an approved regional water plan, or a feasibility study for a project in those plans from taking part in building a reservoir under this section of the Water Code. It touches engineering firms that do water planning work for the state and regional planning groups, and the agencies that pick contractors for reservoir construction. On the ground, the firms that plan and study a reservoir can no longer also win the work of building it, starting September 1, 2025.

Labels

Labels: QUICK READ: 108 WORDS. The bill as filed runs 108 words, counting the existing law it amends and the text it strikes. The median 89R bill as filed runs 441 words (derived, 8,702 graded bills, snapshot Oct 19, 2026).NEVER GOT A HEARING. Filed Jan 27, 2025 and referred to the House Natural Resources committee. No public hearing. The bill died.

Receipt

The receipt

89R-HB2114 · 2025-01-27

SOLD BY

ITEM

relating to the engineering feasibility and construction of a reservoir.

WHAT IT DOES

Helped write the plan or feasibility study? You can’t build it.

The bill bars any engineering firm that was hired to help write the state water plan, an approved regional water plan, or a feasibility study for a project in those plans from taking part in building a reservoir under this section of the Water Code. It touches engineering firms that do water planning work for the state and regional planning groups, and the agencies that pick contractors for reservoir construction. On the ground, the firms that plan and study a reservoir can no longer also win the work of building it, starting September 1, 2025.

CHARGES

[ ] NONE FOUND

TOTAL

No fiscal note in the loaded record.

HISTORY

  1. Filed
  2. Read first time
  3. Referred to Natural Resources
FILED UNDER

No verified beat found.

No flags

THANK YOU FOR CHECKING THE RECEIPT

CAMPAIGN PAID FOR BY

CAMPAIGN PAID FOR BY

Donors

Texans for Lawsuit Reform PAC Austin TX$15,000
HEB PAC San Antonio TX$5,000
Jason Itkin Arnold Itkin Houston TX$5,000

Derived from itemized gifts, Jul 1, 2024 to Jun 30, 2026. State data as of Nov 4, 2026.

Not tied to this bill.

Sources

The author's campaign account only. Own money and internal transfers are separate on the member page.

$67,121 raised in 4 of 4 reports since Jul 1, 2024. Derived sum of published report totals. Flow, Jul 1, 2024 through Jun 30, 2026. State filing data as of Nov 4, 2026. 4 of 4 filed reports carry a published figure. Partial total. Regular reports do not cover Aug 15, 2025 to Sep 4, 2025.

$104,472 spent since Jul 1, 2024. Derived sum of published report totals. Flow, Jul 1, 2024 through Jun 30, 2026. State filing data as of Nov 4, 2026. 4 of 4 filed reports carry a published figure.

$35,071 cash on hand. Published report total. Stock, as of Jun 30, 2026. State filing data as of Nov 4, 2026.

$0 loans outstanding. Published report total. Stock, as of Jun 30, 2026. State filing data as of Nov 4, 2026.

Derived sum of itemized contributions in regular reports and uncovered special-session dates. Unitemized contributions are not included. Flow, Jul 1, 2024 through Jun 30, 2026. State filing data as of Nov 4, 2026.

Money

Missing data does not establish zero giving. Display amounts are rounded.

Votes

No floor vote loaded for this bill.

Fiscal

No fiscal note in the loaded record.

How this was graded

Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.

Sources

Texas House · Filed Jan 27, 2025

03/14/2025 H Referred to Natural Resources: Mar 14 2025 2:36PM

Texas Legislature Online · Introduced

Data snapshot Oct 26, 2026 at 4:20 AM CDT. Grades, charges, quotes and corrections follow the published record.

House committee · Natural Resources · Final status: Died in committee

Subjects

Environment--Water

Water--Development

DESIGN-BUILD CONTRACTS

Text

The text as introduced · 108 words

By: VanDeaver
H.B. No. 2114

A BILL TO BE ENTITLED

AN ACT

relating to the engineering feasibility and construction of a

reservoir.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Section 16.051, Water Code, is amended by adding

Subdivision (g-2) to read as follows:

(g-2) An engineering firm contracted or procured to

assist in the preparation of the state water plan, a regional water

plan approved under Section 16.053, or the feasibility of a project

contained within these plans shall not be eligible to participate

in the construction of a reservoir under this section.

SECTION 2. This Act takes effect September 1, 2025.