HB 3298
bill widening notice on concrete batch plant permits
Died in committee
Verdict: No flags
Initial review · graded Oct 20, 2026 · Headline, summary and grade are analysis of the bill text, not a finding about any person · How we grade
Caption
relating to air quality permits for certain concrete batch plants.
Caption from analyzed text · version I.
Summary
County judges and city leaders hear about hearings and the final decision too.
The bill makes the state environmental agency send local county judges and city leaders notice not just of a concrete batch plant permit application but also of comment periods, meetings, hearings and the final decision. It doubles the required distance between a standard-permit concrete plant's central baghouse and homes, schools or churches from 440 yards to 880 yards, and applies that buffer everywhere, not just outside city zoning. Concrete plant operators seeking new standard permits after September 1, 2025 face the bigger buffer, and neighbors and local officials get more notice.
Labels
Labels: NEVER GOT A HEARING. Filed Feb 25, 2025 and referred to the House Environmental Regulation committee. No public hearing. The bill died.
Receipt
The receipt
89R-HB3298 · 2025-02-25
SOLD BY
ITEM
relating to air quality permits for certain concrete batch plants.
WHAT IT DOES
County judges and city leaders hear about hearings and the final decision too.
The bill makes the state environmental agency send local county judges and city leaders notice not just of a concrete batch plant permit application but also of comment periods, meetings, hearings and the final decision. It doubles the required distance between a standard-permit concrete plant's central baghouse and homes, schools or churches from 440 yards to 880 yards, and applies that buffer everywhere, not just outside city zoning. Concrete plant operators seeking new standard permits after September 1, 2025 face the bigger buffer, and neighbors and local officials get more notice.
CHARGES
[ ] NONE FOUND
TOTAL
No fiscal note in the loaded record.
HISTORY
- Filed
- Read first time
- Referred to Environmental Regulation
FILED UNDER
No verified beat found.
THANK YOU FOR CHECKING THE RECEIPT
CAMPAIGN PAID FOR BY
CAMPAIGN PAID FOR BY
Donors
Not tied to this bill.
Sources
The author's campaign account only. Own money and internal transfers are separate on the member page.
Derived itemized flow · Oct 29, 2024 to Oct 19, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Texas Sands PAC$30,000.00
Texas Sands PAC
$30,000.00
- Cash
- $30,000.00
- Paid by others
- $0.00
- Total
- $30,000.00
Also funds 121 other sitting lawmakers.
Derived recipient stock · Jul 3, 2024 to Oct 24, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Dec 5, 2024 to Feb 19, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100982635, 101040208.
Texas Trial Lawyers Association PAC$25,000.00
Texas Trial Lawyers Association PAC
$25,000.00
- Cash
- $25,000.00
- Paid by others
- $0.00
- Total
- $25,000.00
Also funds 137 other sitting lawmakers.
Derived recipient stock · Jul 24, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Nov 27, 2024 to Jan 16, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100982635, 101028685, 101035822.
Texas House Democratic Campaign Committee$7,000.00
Texas House Democratic Campaign Committee
$7,000.00
- Cash
- $7,000.00
- Paid by others
- $0.00
- Total
- $7,000.00
Also funds 9 other sitting lawmakers.
Derived recipient stock · Oct 15, 2024 to Oct 15, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
TeamSources
Derived itemized flow · on Apr 30, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101057584.
Missing data does not establish zero giving. Display amounts are rounded.
Texas Sands PAC
$30,000.00
- Cash
- $30,000.00
- Paid by others
- $0.00
- Total
- $30,000.00
Also funds 121 other sitting lawmakers.
Derived recipient stock · Jul 3, 2024 to Oct 24, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Dec 5, 2024 to Feb 19, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100982635, 101040208.
Texas Trial Lawyers Association PAC
$25,000.00
- Cash
- $25,000.00
- Paid by others
- $0.00
- Total
- $25,000.00
Also funds 137 other sitting lawmakers.
Derived recipient stock · Jul 24, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Nov 27, 2024 to Jan 16, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100982635, 101028685, 101035822.
Texas House Democratic Campaign Committee
$7,000.00
- Cash
- $7,000.00
- Paid by others
- $0.00
- Total
- $7,000.00
Also funds 9 other sitting lawmakers.
Derived recipient stock · Oct 15, 2024 to Oct 15, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
TeamSources
Derived itemized flow · on Apr 30, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101057584.
Votes
No floor vote loaded for this bill.
Fiscal
No fiscal note in the loaded record.
How this was graded
Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.
Sources
Texas House · Filed Feb 25, 2025
03/20/2025 H Referred to Environmental Regulation: Mar 20 2025 11:50AM
Texas Legislature Online · Introduced
Data snapshot Oct 26, 2026 at 4:20 AM CDT. Grades, charges, quotes and corrections follow the published record.
House committee · Environmental Regulation · Final status: Died in committee
Subjects
Environment--Air
CEMENT & CONCRETE
PERMITS
ENVIRONMENTAL QUALITY, TEXAS COMMISSION ON
Text
The text as introduced · 961 words
89R12623 KRM-F By: Reynolds H.B. No. 3298 A BILL TO BE ENTITLED AN ACT relating to air quality permits for certain concrete batch plants. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 382.0516(b), Health and Safety Code, is amended to read as follows: (b) In addition to the notice required by Subsection (a), for an application that relates to an existing or proposed concrete batch plant, on receiving an application for a construction permit, an amendment to a construction permit, an operating permit, or an authorization to use a standard permit, the commission shall send notice of the application and, as applicable, any public comment period, public meeting, public hearing, or contested case hearing held and decision of the executive director or commission issued regarding the application to : (1) [ to ] the county judge of the county in which the facility is or will be located; and (2) if the facility is or will be located in a municipality or the extraterritorial jurisdiction of a municipality, [ to ] the presiding officer of the municipality's governing body. SECTION 2. Section 382.05198(a), Health and Safety Code, is amended to read as follows: (a) The commission shall issue a standard permit for a permanent concrete plant that performs wet batching, dry batching, or central mixing and that meets the following requirements: (1) production records must be maintained on site while the plant is in operation until the second anniversary of the end of the period to which they relate; (2) each cement or fly ash storage silo and weigh hopper must be equipped with a fabric or cartridge filter or vented to a fabric or cartridge filter system; (3) each fabric or cartridge filter, fabric or cartridge filter system, and suction shroud must be maintained and operated properly with no tears or leaks; (4) excluding the suction shroud filter system, each filter system must be designed to meet a standard of at least 0.01 outlet grain loading as measured in grains per dry standard cubic foot; (5) each filter system and each mixer loading and batch truck loading emissions control device must meet a performance standard of no visible emissions exceeding 30 seconds in a five-minute period as determined using United States Environmental Protection Agency Test Method 22 as that method existed on September 1, 2003; (6) if a cement or fly ash silo is filled during nondaylight hours, the silo filter system exhaust must be sufficiently illuminated to enable a determination of compliance with the performance standard described by Subdivision (5); (7) the conveying system for the transfer of cement or fly ash to and from each storage silo must be totally enclosed, operate properly, and be maintained without any tears or leaks; (8) except during cement or fly ash tanker connection or disconnection, each conveying system for the transfer of cement or fly ash must meet the performance standard described by Subdivision (5); (9) a warning device must be installed on each bulk storage silo to alert the operator in sufficient time for the operator to stop loading operations before the silo is filled to a level that may adversely affect the pollution abatement equipment; (10) if filling a silo results in failure of the pollution abatement system or failure to meet the performance standard described by Subdivision (5), the failure must be documented and reported to the commission; (11) each road, parking lot, or other area at the plant site that is used by vehicles must be paved with a cohesive hard surface that is properly maintained, cleaned, and watered so as to minimize dust emissions; (12) each stockpile must be sprinkled with water or dust-suppressant chemicals or covered so as to minimize dust emissions; (13) material used in the batch that is spilled must be immediately cleaned up and contained or dampened so as to minimize dust emissions; (14) production of concrete at the plant must not exceed 300 cubic yards per hour; (15) a suction shroud or other pickup device must be installed at the batch drop point or, in the case of a central mix plant, at the drum feed and vented to a fabric or cartridge filter system with a minimum capacity of 5,000 cubic feet per minute of air; (16) the bag filter and capture system must be properly designed to accommodate the increased flow from the suction shroud and achieve a control efficiency of at least 99.5 percent; (17) the suction shroud baghouse exhaust must be located more than 100 feet from any property line; (18) stationary equipment, stockpiles, and vehicles used at the plant, except for incidental traffic and vehicles as they enter and exit the site, must be located or operated more than 100 feet from any property line; and (19) the central baghouse must be located at least 880 [ 440 ] yards from any building used as a single or multifamily residence, school, or place of worship at the time the application to use the permit is filed with the commission [ if the plant is located in an area that is not subject to municipal zoning regulation ]. SECTION 3. The changes in law made by this Act apply only to a permit, a permit amendment, or an authorization to use a permit the application for which is filed with the Texas Commission on Environmental Quality on or after the effective date of this Act. A permit, a permit amendment, or an authorization to use a permit the application for which is filed before the effective date of this Act is governed by the law in effect on the date of filing, and that law is continued in effect for that purpose. SECTION 4. This Act takes effect September 1, 2025.