Caption

relating to the removal of certain power facilities operated on leased property.

Caption from analyzed text · version I.

Summary

Lease land for grid-scale power, post a bond within 30 days. Forfeit it, no permits.

The bill moves the state's wind-farm cleanup law into the Health and Safety Code and expands it to solar farms, battery storage sites, and other renewable power plants built on leased land. Companies leasing land for grid-scale power facilities must promise in the lease to remove their equipment and restore the land, and must post a bond or other financial assurance with the Texas Commission on Environmental Quality, due within 30 days after the lease begins. The commission inspects the site and decides whether to release that money to the company or give it to the landowner, and a company whose bond is forfeited cannot get or renew state permits to run these generation facilities.

Labels

Labels: NEVER GOT A HEARING. Filed Feb 20, 2025 and referred to the Senate Business & Commerce committee. No public hearing. The bill died.

Receipt

The receipt

89R-SB1478 · 2025-02-20

SOLD BY

ITEM

relating to the removal of certain power facilities operated on leased property.

WHAT IT DOES

Lease land for grid-scale power, post a bond within 30 days. Forfeit it, no permits.

The bill moves the state's wind-farm cleanup law into the Health and Safety Code and expands it to solar farms, battery storage sites, and other renewable power plants built on leased land. Companies leasing land for grid-scale power facilities must promise in the lease to remove their equipment and restore the land, and must post a bond or other financial assurance with the Texas Commission on Environmental Quality, due within 30 days after the lease begins. The commission inspects the site and decides whether to release that money to the company or give it to the landowner, and a company whose bond is forfeited cannot get or renew state permits to run these generation facilities.

CHARGES

[ ] NONE FOUND

TOTAL

No fiscal note in the loaded record.

HISTORY

  1. Received by the Secretary of the Senate
  2. Filed
  3. Read first time
  4. Referred to Business & Commerce
FILED UNDER

DATA CENTERS, WATER AND THE GRID

THE TEXT

“This chapter applies only to an electric energy storage facility, a renewable power facility, a solar power facility, or a wind power facility that is intended to provide energy or ancillary services at wholesale for a power grid.”

Bill text, introduced version (I)

The bill sets cleanup and bonding rules for grid-scale wind, solar, storage and other renewable plants on leased land, and decides who pays for removal when a facility stops running.

No flags

THANK YOU FOR CHECKING THE RECEIPT

CAMPAIGN PAID FOR BY

CAMPAIGN PAID FOR BY

Donors

Not tied to this bill.

Sources

The author's campaign account only. Own money and internal transfers are separate on the member page.

Derived itemized flow · Jul 1, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Texans for Lawsuit Reform PAC$135,000.00

Texans for Lawsuit Reform PAC

$135,000.00

Cash
$129,000.00
Paid by others
$6,000.00
Total
$135,000.00
polling $6,000.00

Also funds 124 other sitting lawmakers.

Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.

Texans United for a Conservative Majority PAC$116,000.00

Texans United for a Conservative Majority PAC

$116,000.00

Cash
$110,000.00
Paid by others
$6,000.00
Total
$116,000.00
polling $6,000.00

Also funds 30 other sitting lawmakers.

Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101010195, 101033131, 101073278.

Bryan Hughes Campaign$100,000.00

Bryan Hughes Campaign

$100,000.00

Cash
$100,000.00
Paid by others
$0.00
Total
$100,000.00

Also funds 0 other sitting lawmakers.

Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073278.

Money

Missing data does not establish zero giving. Display amounts are rounded.

×

Texans for Lawsuit Reform PAC

$135,000.00

Cash
$129,000.00
Paid by others
$6,000.00
Total
$135,000.00
polling $6,000.00

Also funds 124 other sitting lawmakers.

Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.

×

Texans United for a Conservative Majority PAC

$116,000.00

Cash
$110,000.00
Paid by others
$6,000.00
Total
$116,000.00
polling $6,000.00

Also funds 30 other sitting lawmakers.

Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101010195, 101033131, 101073278.

×

Bryan Hughes Campaign

$100,000.00

Cash
$100,000.00
Paid by others
$0.00
Total
$100,000.00

Also funds 0 other sitting lawmakers.

Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073278.

Votes

No floor vote loaded for this bill.

Fiscal

No fiscal note in the loaded record.

How this was graded

Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.

Sources

Texas Senate · Filed Feb 20, 2025

03/06/2025 S Referred to Business & Commerce

Texas Legislature Online · Introduced

Data snapshot Oct 26, 2026 at 4:20 AM CDT. Grades, charges, quotes and corrections follow the published record.

Senate committee · Business & Commerce · Final status: Died in committee

Subjects

Energy--Alternative Fuels

Energy--Geothermal (IP9BV)

Energy--Solar

Energy--Wind (IA9YE)

Environment--General

Property Interests--Landlord & Tenant

Property Interests--Real Property

Special Districts & Authorities--River Authorities

Utilities--Electric

RENEWABLE ENERGY

ENVIRONMENTAL QUALITY, TEXAS COMMISSION ON

PUBLIC UTILITY COMMISSION

Text

The text as introduced · 3,419 words

89R4312 JXC-D

By: Hall
S.B. No. 1478

A BILL TO BE ENTITLED

AN ACT

relating to the removal of certain power facilities operated on

leased property.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Chapter 301, Utilities Code, is transferred to

Subtitle B, Title 5, Health and Safety Code, redesignated as

Chapter 375, Health and Safety Code, and amended to read as follows:

CHAPTER 375 [ 301 ]. [ WIND ] POWER FACILITY AGREEMENTS AND FINANCIAL

ASSURANCE

Sec. 375.0001 [ 301.0001 ]. DEFINITIONS. In this chapter:

(1) "Commission" means the Texas Commission on

Environmental Quality.

(2) "Electric energy storage facility agreement"

means a lease agreement between a grantee and a landowner that

authorizes the grantee to operate an electric energy storage

facility on the leased property.

(3) "Grantee" means a person who[ :

[ (A) ] leases property from a landowner[ ; and

[ (B) operates a wind power facility on the

property ].

(4) "Renewable power facility" means a facility that:

(A) generates electric energy using a renewable

energy technology, as defined by Section 39.916, Utilities Code,

other than a technology that relies exclusively on wind or solar

energy; and

(B) is not an electric energy storage facility.

(5) "Renewable power facility agreement" means a lease

agreement between a grantee and a landowner that authorizes the

grantee to operate a renewable power facility on the leased

property.

(6) "Solar energy device" has the meaning assigned by

Section 185.001, Utilities Code.

(7) "Solar power facility" includes:

(A) a solar energy device; and

(B) a facility or equipment, other than a

facility or equipment owned by an electric utility, as defined by

Section 31.002, Utilities Code, used to support the operation of a

solar energy device, including an underground or aboveground

electrical transmission or communications line, an electric

transformer, a battery storage facility, an energy storage

facility, telecommunications equipment, a road, a meteorological

tower, or a maintenance yard.

(8) "Solar power facility agreement" means a lease

agreement between a grantee and a landowner that authorizes the

grantee to operate a solar power facility on the leased property.

(9) [ (2) ] "Wind power facility" includes:

(A) a wind turbine generator; and

(B) a facility or equipment used to support the

operation of a wind turbine generator, including an underground or

aboveground electrical transmission or communications line, an

electric transformer, a battery storage facility, an energy storage

facility, telecommunications equipment, a road, a meteorological

tower with wind measurement equipment, or a maintenance yard.

(10) [ (3) ] "Wind power facility agreement" means a

lease agreement between a grantee and a landowner that authorizes

the grantee to operate a wind power facility on the leased property.

Sec. 375.0002. APPLICABILITY. This chapter applies only to

an electric energy storage facility, a renewable power facility, a

solar power facility, or a wind power facility that is intended to

provide energy or ancillary services at wholesale for a power grid.

Sec. 375.0003 [ 301.0002 ]. WAIVER VOID; REMEDIES. (a) A

provision of an electric energy storage facility agreement, a

renewable power facility agreement, a solar power facility

agreement, or a wind power facility agreement that purports to

waive a right or exempt a grantee from a liability or duty

established by this chapter is void.

(b) A person who is harmed by a violation of this chapter is

entitled to appropriate injunctive relief to prevent further

violation of this chapter.

(c) The provisions of this section are not exclusive. The

remedies provided in this section are in addition to any other

procedures or remedies provided by other law.

Sec. 375.0004 [ 301.0003 ]. REQUIRED AGREEMENT PROVISIONS ON

WIND POWER FACILITY REMOVAL. (a) A wind power facility agreement

must provide that the grantee is responsible for removing the

grantee's wind power facilities from the landowner's property and

that the grantee shall, in accordance with any other applicable

laws or regulations, safely:

(1) clear, clean, and remove from the property:

(A) each wind turbine generator, including

towers and pad-mount transformers;

(B) all liquids, greases, or similar substances

contained in a wind turbine generator;

(C) each substation; and

(D) all liquids, greases, or similar substances

contained in a substation;

(2) for each tower foundation and pad-mount

transformer foundation installed in the ground:

(A) clear, clean, and remove the foundation from

the ground to a depth of at least three feet below the surface grade

of the land in which the foundation is installed; and

(B) ensure that each hole or cavity created in

the ground by the removal is filled with topsoil of the same type or

a similar type as the predominant topsoil found on the property;

(3) for each buried cable, including power,

fiber-optic, and communications cables, installed in the ground:

(A) clear, clean, and remove the cable from the

ground to a depth of at least three feet below the surface grade of

the land in which the cable is installed; and

(B) ensure that each hole or cavity created in

the ground by the removal is filled with topsoil of the same type or

a similar type as the predominant topsoil found on the property; and

(4) clear, clean, and remove from the property each

overhead power or communications line installed by the grantee on

the property.

(b) The agreement must provide that, at the request of the

landowner, the grantee shall:

(1) clear, clean, and remove each road constructed by

the grantee on the property; and

(2) ensure that each hole or cavity created in the

ground by the removal is filled with topsoil of the same type or a

similar type as the predominant topsoil found on the property.

(c) The agreement must provide that, at the request of the

landowner, if reasonable, the grantee shall:

(1) remove from the property all rocks over 12 inches

in diameter excavated during the decommissioning or removal

process;

(2) return the property to a tillable state using

scarification, V-rip, or disc methods, as appropriate; and

(3) ensure that:

(A) each hole or cavity created in the ground by

the removal is filled with topsoil of the same type or a similar

type as the predominant topsoil found on the property; and

(B) the surface is returned as near as reasonably

possible to the same condition as before the grantee dug holes or

cavities, including by reseeding pastureland with native grasses

prescribed by an appropriate governmental agency, if any.

(d) The landowner shall make a request under Subsection (b)

or (c) not later than the 180th day after the later of:

(1) the date on which the wind power facility is no

longer capable of generating electricity in commercial quantities;

or

(2) the date the landowner receives written notice of

intent to decommission the wind power facility from the grantee.

Sec. 375.0005. REQUIRED AGREEMENT PROVISIONS ON SOLAR POWER

FACILITY REMOVAL. (a) A solar power facility agreement must

provide that the grantee is responsible for removing the grantee's

solar power facilities from the landowner's property and that the

grantee shall, in accordance with any other applicable laws or

regulations, safely:

(1) clear, clean, and remove from the property each

solar energy device, transformer, and substation;

(2) for each foundation of a solar energy device,

transformer, or substation installed in the ground:

(A) clear, clean, and remove the foundation from

the ground to a depth of at least three feet below the surface grade

of the land in which the foundation is installed; and

(B) ensure that each hole or cavity created in

the ground by the removal is filled with soil of the same type or a

similar type as the predominant soil found on the property;

(3) for each buried cable, including power,

fiber-optic, and communications cables, installed in the ground:

(A) clear, clean, and remove the cable from the

ground to a depth of at least three feet below the surface grade of

the land in which the cable is installed; and

(B) ensure that each hole or cavity created in

the ground by the removal is filled with soil of the same type or a

similar type as the predominant soil found on the property; and

(4) clear, clean, and remove from the property each

overhead power or communications line installed by the grantee on

the property.

(b) The agreement must provide that, at the request of the

landowner, the grantee shall:

(1) clear, clean, and remove each road constructed by

the grantee on the property; and

(2) ensure that each hole or cavity created in the

ground by the removal is filled with soil of the same type or a

similar type as the predominant soil found on the property.

(c) The agreement must provide that, at the request of the

landowner, if reasonable, the grantee shall:

(1) remove from the property all rocks over 12 inches

in diameter excavated during the decommissioning or removal

process;

(2) return the property to a tillable state using

scarification, V-rip, or disc methods, as appropriate; and

(3) ensure that:

(A) each hole or cavity created in the ground by

the removal is filled with soil of the same type or a similar type as

the predominant soil found on the property; and

(B) the surface is returned as near as reasonably

possible to the same condition as before the grantee dug holes or

cavities, including by reseeding pastureland with native grasses

prescribed by an appropriate governmental agency, if any.

(d) The landowner shall make a request under Subsection (b)

or (c) not later than the 180th day after the later of:

(1) the date on which the solar power facility is no

longer capable of generating electricity in commercial quantities;

or

(2) the date the landowner receives written notice of

intent to decommission the solar power facility from the grantee.

Sec. 375.0006. REQUIRED AGREEMENT PROVISIONS ON ELECTRIC

ENERGY STORAGE OR RENEWABLE POWER FACILITY REMOVAL. An electric

energy storage facility agreement or renewable power facility

agreement must provide that the grantee is responsible for:

(1) removing the grantee's electric energy storage

facilities or renewable power facilities, as applicable, from the

landowner's property; and

(2) restoring the property to as near as reasonably

possible the condition of the property as of the date the agreement

begins.

Sec. 375.0007 [ 301.0004 ]. REQUIRED AGREEMENT PROVISIONS ON

FINANCIAL ASSURANCE. (a) An electric energy storage facility

agreement, a renewable power facility agreement, a solar power

facility agreement, or a [ A ] wind power facility agreement must

provide that the grantee shall obtain and deliver to the commission

[ landowner ] evidence of financial assurance payable to the

landowner that conforms to the requirements of this section to

secure the performance of the grantee's obligation to remove the

grantee's electric energy storage facilities, renewable power

facilities, solar power facilities, or wind power facilities

located on the landowner's property as required by this chapter [ as

described by Section 301.0003 ]. The [ Acceptable forms of ]

financial assurance may be [ include a parent company guaranty with

a minimum investment grade credit rating for the parent company

issued by a major domestic credit rating agency, a letter of

credit, ] a bond[ , ] or another form of financial assurance

acceptable to the landowner.

(b) The amount of the financial assurance must be at least

equal to the estimated amount by which the cost of removing the

[ wind power ] facilities from the landowner's property and restoring

the property to as near as reasonably possible the condition of the

property as of the date the agreement begins exceeds the salvage

value of the [ wind power ] facilities, less any portion of the value

of the [ wind power ] facilities pledged to secure outstanding debt.

(c) The agreement must provide that:

(1) the estimated cost of removing the [ wind power ]

facilities from the landowner's property and restoring the property

to as near as reasonably possible the condition of the property as

of the date the agreement begins and the estimated salvage value of

the [ wind power ] facilities must be determined by an independent,

third-party professional engineer licensed in this state;

(2) the grantee must deliver to the landowner and the

commission an updated estimate, prepared by an independent,

third-party professional engineer licensed in this state, of the

cost of removal and the salvage value at least once every five years

for the remainder of the term of the agreement; and

(3) the grantee is responsible for ensuring that the

amount of the financial assurance remains sufficient to cover the

amount required by Subsection (b), consistent with the estimates

required by this subsection.

(d) The grantee is responsible for the costs of obtaining

financial assurance described by this section and costs of

determining the estimated removal costs and salvage value.

(e) The agreement must provide that the grantee shall

deliver the financial assurance to the commission not later than

the 30th day after [ earlier of:

[ (1) ] the date the [ wind power facility ] agreement

begins [ is terminated; or

[ (2) the 10th anniversary of the commercial operations

date of the wind power facilities located on the landowner's leased

property ].

(f) [ For purposes of this section, "commercial operations

date" means the date on which the wind power facilities are approved

for participation in market operations by a regional transmission

organization and does not include the generation of electrical

energy or other operations conducted before that date for purposes

of maintenance and testing.

[ (g) ] The grantee may not cancel financial assurance before

the date the grantee has completed the grantee's obligation to

remove the grantee's [ wind power ] facilities located on the

landowner's property as required [ in the manner provided ] by this

chapter, unless the grantee provides the commission [ landowner ]

with replacement financial assurance at the time of or before the

cancellation. In the event of a transfer of ownership of the

grantee's [ wind power ] facilities, the financial security provided

by the grantee shall remain in place until the date evidence of

financial security meeting the requirements of this chapter is

provided to the commission [ landowner ].

Sec. 375.0008. RELEASE OF FINANCIAL ASSURANCE TO GRANTEE.

(a) At any time, a grantee may file an application with the

commission for the release of all or part of a bond or other

financial assurance provided to the commission by the grantee for a

landowner under this chapter.

(b) The application must be on a form prescribed by the

commission and, in addition to other information the commission may

require, must include the type and the approximate date of removal

and restoration work performed and a description of the results

achieved.

(c) The grantee shall provide a copy of the application to

the landowner not later than the 30th day after the date the grantee

files the application with the commission.

(d) Not later than the 45th day after the date the grantee

files the application, the commission shall conduct an inspection

and evaluation of the removal and restoration work performed.

(e) The commission may release all or part of the financial

assurance if the commission determines that the grantee has

completed all or part of the grantee's obligations under the

agreement entered into under Section 375.0004, 375.0005, or

375.0006, as applicable.

(f) If the commission disapproves the application for

release of the financial assurance, the commission shall notify the

grantee in writing of the reasons for disapproval and recommend

corrective actions necessary to secure the release of the financial

assurance.

Sec. 375.0009. FORFEITURE OF FINANCIAL ASSURANCE TO

LANDOWNER. (a) A landowner may file an application with the

commission for the forfeiture of all or part of a bond or other

financial assurance provided to the commission by a grantee for the

landowner under this chapter if:

(1) the grantee has not completed the grantee's

obligations under the agreement entered into under Section

375.0004, 375.0005, or 375.0006, as applicable; and

(2) the facility that is the subject of the agreement

is no longer being used by the grantee to provide energy or

ancillary services at wholesale for a power grid in the manner

provided by the agreement.

(b) The application must be on a form prescribed by the

commission.

(c) The landowner shall provide a copy of the application to

the grantee not later than the 30th day after the date the landowner

files the application with the commission.

(d) Not later than the 45th day after the date the landowner

files the application, the commission shall conduct an inspection

and evaluation of the property for which the financial assurance

was provided.

(e) The commission may approve the forfeiture of all or part

of the financial assurance if the commission determines that:

(1) the facility that is the subject of the agreement

is no longer being used in the manner described by Subsection

(a)(2); and

(2) the forfeiture is necessary to compensate the

landowner for any remaining removal and restoration work the

grantee was required to but did not complete under the agreement.

(f) If the commission disapproves the application for

forfeiture of the financial assurance, the commission shall notify

the landowner in writing of the reasons for disapproval.

Sec. 375.0010. COMMISSION AUTHORITY. (a) The commission

shall notify the Public Utility Commission of Texas if the

commission requires forfeiture of financial assurance under

Section 375.0009. The commission and the Public Utility Commission

of Texas may not issue to a grantee whose financial assurance was

forfeited under Section 375.0009 any permit, certificate, or

registration under other law that authorizes the grantee to operate

a generation facility to which this chapter applies or renew any

such permit, certificate, or registration.

(b) In a suit for receivership, garnishment, or bankruptcy,

or in any other legal action affecting the assets of a grantee that

is a party to an agreement subject to this chapter, the commission

may:

(1) inform the appropriate court and parties of the

commission's interest in obtaining notice of the proceedings; and

(2) within the time prescribed by the applicable

statutes, rules, and court orders, intervene and participate in any

proceedings that affect a landowner not joined in the suit who is a

party to the agreement with the grantee.

SECTION 2. Section 5.013(a), Water Code, is amended to read

as follows:

(a) The commission has general jurisdiction over:

(1) water and water rights including the issuance of

water rights permits, water rights adjudication, cancellation of

water rights, and enforcement of water rights;

(2) continuing supervision over districts created

under Article III, Sections 52(b)(1) and (2), and Article XVI,

Section 59, of the Texas Constitution;

(3) the state's water quality program including

issuance of permits, enforcement of water quality rules, standards,

orders, and permits, and water quality planning;

(4) the determination of the feasibility of certain

federal projects;

(5) the adoption and enforcement of rules and

performance of other acts relating to the safe construction,

maintenance, and removal of dams;

(6) conduct of the state's hazardous spill prevention

and control program;

(7) the administration of the state's program relating

to inactive hazardous substance, pollutant, and contaminant

disposal facilities;

(8) the administration of a portion of the state's

injection well program;

(9) the administration of the state's programs

involving underground water and water wells and drilled and mined

shafts;

(10) the state's responsibilities relating to regional

waste disposal;

(11) the responsibilities assigned to the commission

by Chapters 361, 363, 375, 382, 401, 505, 506, and 507, Health and

Safety Code; and

(12) any other areas assigned to the commission by

this code and other laws of this state.

SECTION 3. (a) The heading to Title 6, Utilities Code, is

repealed.

(b) Chapter 302, Utilities Code, is repealed.

SECTION 4. The changes in law made by this Act apply only to

an electric energy storage facility agreement, a renewable power

facility agreement, a solar power facility agreement, or a wind

power facility agreement entered into on or after the effective

date of this Act. An agreement entered into before the effective

date of this Act is governed by the law applicable to the agreement

on the date the agreement was entered into, and that law is

continued in effect for that purpose.

SECTION 5. This Act takes effect immediately if it receives

a vote of two-thirds of all the members elected to each house, as

provided by Section 39, Article III, Texas Constitution. If this

Act does not receive the vote necessary for immediate effect, this

Act takes effect September 1, 2025.