relating to the issuance by the Public Utility Commission of Texas of a permit for the installation of certain electric energy storage equipment or facilities; authorizing a fee.
Caption from analyzed text · version I.
Summary
Spaced to limit fire spread, placed so a fire won’t block a neighborhood’s only road.
The bill makes anyone who wants to install battery or other energy storage to sell power wholesale on the ERCOT grid first get a location permit from the Public Utility Commission. It covers private developers, electric cooperatives and city-owned utilities, and it requires notice to the local fire department and the county judge, with public meetings on request of a local legislator or when there is substantial public interest. On the ground, new storage sites connected after September 1, 2025 must be spaced to limit fire spread and placed so a fire will not block the only road into a neighborhood, and applicants pay a fee set by the commission.
Labels
Labels: FEE INCLUDED. The caption of the graded version (introduced) reads: “relating to the issuance by the Public Utility Commission of Texas of a permit for the installation of certain electric energy storage equipment or facilities; authorizing a fee.”NEVER GOT A HEARING. Filed Feb 21, 2025 and referred to the Senate Business & Commerce committee. No public hearing. The bill died.
Receipt
The receipt
89R-SB1519 · 2025-02-21
SOLD BY
+ 1 coauthor
ITEM
relating to the issuance by the Public Utility Commission of Texas of a permit for the installation of certain electric energy storage equipment or facilities; authorizing a fee.
WHAT IT DOES
Spaced to limit fire spread, placed so a fire won’t block a neighborhood’s only road.
The bill makes anyone who wants to install battery or other energy storage to sell power wholesale on the ERCOT grid first get a location permit from the Public Utility Commission. It covers private developers, electric cooperatives and city-owned utilities, and it requires notice to the local fire department and the county judge, with public meetings on request of a local legislator or when there is substantial public interest. On the ground, new storage sites connected after September 1, 2025 must be spaced to limit fire spread and placed so a fire will not block the only road into a neighborhood, and applicants pay a fee set by the commission.
CHARGES
[ ] NONE FOUND
TOTAL
No fiscal note in the loaded record.
HISTORY
- Received by the Secretary of the Senate
- Filed
- Read first time
- Referred to Business & Commerce
- Co-author authorized
ALSO NOTED · NOT CHARGED (1)
NEW FEE, FUND, BOARD OR APPOINTEES · analysis confidence 40%
THE TEXT
“The commission by rule shall adopt a fee to be imposed on”…
Bill text, introduced version (I)
The bill creates a new permit fee, but the caption openly says it authorizes a fee and the fee is limited to covering program costs.
FILED UNDER
DATA CENTERS, WATER AND THE GRID
The bill adds a state siting permit, with fire-safety spacing rules and local notice, for grid battery storage that sells power wholesale in ERCOT.
THANK YOU FOR CHECKING THE RECEIPT
CAMPAIGN PAID FOR BY
CAMPAIGN PAID FOR BY
Donors
Donors report through Friends of Donna Campbell.
Not tied to this bill.
Sources
The author's campaign account only. Own money and internal transfers are separate on the member page.
Derived itemized flow · Oct 27, 2024 to Jun 30, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
MoneyMissing data does not establish zero giving. Display amounts are rounded.
Votes
No floor vote loaded for this bill.
Fiscal
No fiscal note in the loaded record.
How this was graded
Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.
Sources
Texas Senate · Filed Feb 21, 2025
03/06/2025 S Referred to Business & Commerce
Texas Legislature Online · Introduced
Data snapshot Oct 26, 2026 at 4:20 AM CDT. Grades, charges, quotes and corrections follow the published record.
Senate committee · Business & Commerce · Final status: Died in committee
Companion
HB 1343 by Troxclair (identical)
Subjects
City Government--Utilities
Utilities--Electric
PERMITS
PUBLIC UTILITY COMMISSION
Text
The text as introduced · 707 words
89R2108 JXC-F By: Campbell S.B. No. 1519 A BILL TO BE ENTITLED AN ACT relating to the issuance by the Public Utility Commission of Texas of a permit for the installation of certain electric energy storage equipment or facilities; authorizing a fee. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Subchapter E, Chapter 35, Utilities Code, is amended by adding Section 35.154 to read as follows: Sec. 35.154. LOCATION PERMIT. (a) In this section, "person" includes an electric cooperative and a municipally owned utility. (b) A person may not install electric energy storage equipment or facilities intended for use in selling energy or ancillary services at wholesale in the ERCOT power region unless the person holds a permit issued under this section. (c) The commission by rule shall require each permitted electric energy storage equipment or facility to be installed only in a location that: (1) is a sufficient distance from any other electric energy storage equipment or facility to reasonably mitigate the risk of a fire at the permitted electric energy storage equipment or facility spreading to other electric energy storage equipment or facilities; and (2) in the event of a fire at the site of the permitted electric energy storage equipment or facility, is reasonably unlikely to block the only access point to a residential area. (d) A person may apply for a permit under this section by filing with the commission: (1) a description of the proposed location of the electric energy storage equipment or facilities; (2) a description of the type of electric energy storage equipment or facilities; (3) a statement identifying the fire department, as defined by Section 419.021, Government Code, volunteer fire department, fire marshal, or other first responder entity that may reasonably be expected to be the primary first responder to a fire at the location of the electric energy storage equipment or facilities; (4) a statement that the person has provided written notice to the entity identified in Subdivision (3) of the applicant's intent to install electric energy storage equipment or facilities; and (5) any other information required by commission rule. (e) When an application for a permit, or an amendment to a permit issued under this section, is filed, the commission shall give notice of the application to the county judge of the county in which all or a majority of the electric energy storage equipment or facilities are proposed to be located. (f) The commission may hold one or more public meetings on a permit application in the county in which the electric energy storage equipment or facilities are proposed to be located. The commission shall hold a public meeting: (1) on the request of a member of the legislature who represents the area in which the electric energy storage equipment or facilities are proposed to be located; or (2) if the commission determines there is substantial public interest in the proposed permit. (g) The commission by order or rule may delegate to the executive director or another commission employee the authority to hold a public meeting under this section. (h) The commission may approve an application for a permit only if the commission finds that: (1) issuance of the permit would not violate state or federal law; and (2) the location of the proposed electric energy storage equipment or facilities complies with rules adopted under Subsection (c). (i) The commission by rule shall adopt a fee to be imposed on each permit applicant to cover costs associated with implementing this section. (j) For purposes of this section: (1) a provision of Subchapter B or E, Chapter 14, that authorizes the commission to regulate a public utility also applies to a person required to obtain a permit under this section, including an electric cooperative or a municipally owned utility; and (2) a reference in Chapter 15 to a person includes a person required to obtain a permit under this section, including an electric cooperative or a municipally owned utility. SECTION 2. Section 35.154, Utilities Code, as added by this Act, applies only to electric energy storage equipment or facilities interconnected to a transmission facility on or after the effective date of this Act. SECTION 3. This Act takes effect September 1, 2025.