Slawson Bill Freezes 765-Kilovolt Power Lines Until A Study Ends

Filed

Verdict: Smells

SmellsInitial review
Rep. Shelby SlawsonRHouse 59
Why it's charged
Caption mismatch

THE TEXT

“The commission may not approve the construction of a 765-kilovolt transmission line”…

Bill text, introduced version (I)

The caption describes only a feasibility study, but the body bars the commission from approving any 765-kilovolt line, including a named project, until that study is done. That bar is the bill's real bite and the caption does not say so.

Caption mismatch

Initial review · graded Nov 9, 2026 · How we grade

Caption

relating to a study by the Public Utility Commission of Texas on the feasibility of constructing certain extra high voltage transmission lines.

Caption from analyzed text · version I.

Summary

Caption: a study. Bill: no 765-kilovolt line approvals, Permian Basin Reliability Plan included, until it’s done.

The bill bars the Public Utility Commission from approving any 765-kilovolt transmission line, including the Permian Basin Reliability Plan, until the commission studies how such lines perform, what they cost ratepayers, what drives cost overruns, and what supply chain and workforce limits could slow them. It touches the commission, the grid operator's planned extra high voltage buildout, and the utilities and ratepayers who would pay for it, and it requires an outside party that has not worked on similar grid studies since 2020 to review the results. On the ground, approval of these big lines pauses until the study is done, and the whole rule expires September 1, 2029.

Labels

Labels: BACK FROM THE DEAD. Same text as a bill filed before that died: 89R SB 1665 by Sen. Schwertner (Died in committee). Filed in 2 sessions, counting this one. Checked against 88R and 89R only.TRY NO. 2. Filed in 2 sessions: 89R and 90R. Checked against 88R and 89R only.

Receipt

The receipt

90R-HB184 · 2026-11-09

SOLD BY

ITEM

relating to a study by the Public Utility Commission of Texas on the feasibility of constructing certain extra high voltage transmission lines.

WHAT IT DOES

Caption: a study. Bill: no 765-kilovolt line approvals, Permian Basin Reliability Plan included, until it’s done.

The bill bars the Public Utility Commission from approving any 765-kilovolt transmission line, including the Permian Basin Reliability Plan, until the commission studies how such lines perform, what they cost ratepayers, what drives cost overruns, and what supply chain and workforce limits could slow them. It touches the commission, the grid operator's planned extra high voltage buildout, and the utilities and ratepayers who would pay for it, and it requires an outside party that has not worked on similar grid studies since 2020 to review the results. On the ground, approval of these big lines pauses until the study is done, and the whole rule expires September 1, 2029.

CHARGES

[x] CAPTION MISMATCHanalysis confidence 55%

THE TEXT

“The commission may not approve the construction of a 765-kilovolt transmission line”…

Bill text, introduced version (I)

The caption describes only a feasibility study, but the body bars the commission from approving any 765-kilovolt line, including a named project, until that study is done. That bar is the bill's real bite and the caption does not say so.

TOTAL

No fiscal note in the loaded record.

HISTORY

  1. Filed
FILED UNDER

DATA CENTERS, WATER AND THE GRID

THE TEXT

…“including but not limited to approval for the execution of the Permian Basin Reliability Plan (Project 55718)”

Bill text, introduced version (I)

The bill pauses approval of extra high voltage grid lines, including a named Permian Basin project, pending a study focused on the costs to residential ratepayers.

Smells

THANK YOU FOR CHECKING THE RECEIPT

CAMPAIGN PAID FOR BY

CAMPAIGN PAID FOR BY

Donors

Not tied to this bill.

Sources

The author's campaign account only. Own money and internal transfers are separate on the member page.

Derived itemized flow · Oct 30, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Court Reform Action for Families Texas PAC$50,000.00

Court Reform Action for Families Texas PAC

$50,000.00

Cash
$50,000.00
Paid by others
$0.00
Total
$50,000.00

Also funds 32 other sitting lawmakers.

Derived recipient stock · Feb 20, 2026 to Oct 14, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · on Jul 6, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101069356.

Texans for Lawsuit Reform PAC$25,083.33

Texans for Lawsuit Reform PAC

$25,083.33

Cash
$25,000.00
Paid by others
$83.33
Total
$25,083.33
fundraiser $83.33

Also funds 124 other sitting lawmakers.

Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 25, 2025 to Sep 29, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101010888, 101033988, 101072692.

Frank Peinado$20,000.00
Money

Missing data does not establish zero giving. Display amounts are rounded.

×

Court Reform Action for Families Texas PAC

$50,000.00

Cash
$50,000.00
Paid by others
$0.00
Total
$50,000.00

Also funds 32 other sitting lawmakers.

Derived recipient stock · Feb 20, 2026 to Oct 14, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · on Jul 6, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101069356.

×

Texans for Lawsuit Reform PAC

$25,083.33

Cash
$25,000.00
Paid by others
$83.33
Total
$25,083.33
fundraiser $83.33

Also funds 124 other sitting lawmakers.

Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 25, 2025 to Sep 29, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101010888, 101033988, 101072692.

Votes

No floor vote loaded for this bill.

Fiscal

No fiscal note in the loaded record.

How this was graded

Analysis of text version I by a super-expensive superintelligence, Nov 9, 2026, against the published rubric.

FILED BEFORE

Filed 2 times: 89R and now. Checked against 88R and 89R only.

89R SB 1665

by Sen. Schwertner, different lead author · Died in committee · same text

Introduced text

Last action, Mar 11, 2025: Referred to Business & Commerce

Relating to a study by the Public Utility Commission of Texas on the feasibility of constructing certain extra high voltage transmission lines.

Caption, 89R bill history

Sources

Texas House · Filed Nov 9, 2026

11/09/2026 H Filed

Texas Legislature Online · Introduced

Data snapshot Nov 10, 2026 at 2:31 AM CST. Grades, charges, quotes and corrections follow the published record.

Subjects

Interim Studies

Utilities--Electric

PUBLIC UTILITY COMMISSION

Text

The text as introduced · 339 words

By: Slawson
H.B. No. 184

A BILL TO BE ENTITLED

AN ACT

relating to a study by the Public Utility Commission of Texas on the

feasibility of constructing certain extra high voltage

transmission lines.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Subchapter D, Chapter 39, Utilities Code, is

amended by adding Section 39.1671 to read as follows:

Sec. 39.1671. STUDY OF CONSTRUCTION OF 765-KILOVOLT

TRANSMISSION LINE. (a) The commission may not approve the

construction of a 765-kilovolt transmission line, including but not

limited to approval for the execution of the Permian Basin

Reliability Plan (Project 55718) as recommended in the Texas

765-kilovolt Strategic Transmission Expansion Plan submitted by

the independent organization certified under Section 39.151 for the

ERCOT power region, unless the commission first conducts a study to

consider:

(1) the performance of extra high voltage transmission

lines under a variety of dispatch scenarios, including different

times of day, times of year, and weather conditions;

(2) estimated costs to ratepayers, with a particular

emphasis on the estimated costs to residential customers;

(3) factors that may contribute to cost overruns and

potential mitigation of cost overruns; and

(4) supply chain and workforce limitations that may

delay project buildout or contribute to cost overruns.

(b) Subject to Subsection (c), the commission shall submit

the results of the study conducted under Subsection (a) to an

independent third party for review.

(c) The commission may not submit the results of the study

to a third party that conducted a similar study of extra high

voltage transmission lines on behalf of the independent

organization certified under Section 39.151 for the ERCOT power

region or another market participant after January 1, 2020.

(d) This section expires September 1, 2029.

SECTION 2. This Act takes effect immediately if it receives

a vote of two-thirds of all the members elected to each house, as

provided by Section 39, Article III, Texas Constitution. If this

Act does not receive the vote necessary for immediate effect, this

Act takes effect September 1, 2027.