Caption
relating to the interconnection of a facility in the ERCOT power region to certain other facilities.
Caption from analyzed text · version I.
Summary
New out-of-state links need proof of no added federal control.
The bill tightens the rules for connecting any power facility in the ERCOT grid to a facility outside Texas, or to a facility linked to one outside Texas. Electric cooperatives, electric utilities, city-owned utilities and any other person now need a state Public Utility Commission public-interest finding, a timely application, proof that the link will not add federal control over ERCOT, and a final certificate after any federal order. New links built after the law takes effect face this multi-step review, while older links and a previously approved federal settlement project keep their existing treatment.
Receipt
The receipt
90R-SB191 · 2026-11-09
SOLD BY
ITEM
relating to the interconnection of a facility in the ERCOT power region to certain other facilities.
WHAT IT DOES
New out-of-state links need proof of no added federal control.
The bill tightens the rules for connecting any power facility in the ERCOT grid to a facility outside Texas, or to a facility linked to one outside Texas. Electric cooperatives, electric utilities, city-owned utilities and any other person now need a state Public Utility Commission public-interest finding, a timely application, proof that the link will not add federal control over ERCOT, and a final certificate after any federal order. New links built after the law takes effect face this multi-step review, while older links and a previously approved federal settlement project keep their existing treatment.
CHARGES
[ ] NONE FOUND
TOTAL
No fiscal note in the loaded record.
HISTORY
- Received by the Secretary of the Senate
- Filed
FILED UNDER
DATA CENTERS, WATER AND THE GRID
THE TEXT
…“ERCOT power region to additional federal control or jurisdiction;”
Bill text, introduced version (I)
The bill decides who may connect the Texas grid to outside facilities and requires that any new link not add federal control over ERCOT.
THANK YOU FOR CHECKING THE RECEIPT
CAMPAIGN PAID FOR BY
CAMPAIGN PAID FOR BY
Donors
Not tied to this bill.
Sources
The author's campaign account only. Own money and internal transfers are separate on the member page.
Derived itemized flow · Jul 1, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Texans for Lawsuit Reform PAC$135,000.00
Texans for Lawsuit Reform PAC
$135,000.00
- Cash
- $129,000.00
- Paid by others
- $6,000.00
- Total
- $135,000.00
Also funds 124 other sitting lawmakers.
Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.
Texans United for a Conservative Majority PAC$116,000.00
Texans United for a Conservative Majority PAC
$116,000.00
- Cash
- $110,000.00
- Paid by others
- $6,000.00
- Total
- $116,000.00
Also funds 30 other sitting lawmakers.
Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101010195, 101033131, 101073278.
Bryan Hughes Campaign$100,000.00
Bryan Hughes Campaign
$100,000.00
- Cash
- $100,000.00
- Paid by others
- $0.00
- Total
- $100,000.00
Also funds 0 other sitting lawmakers.
Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
Sources
Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101073278.
Missing data does not establish zero giving. Display amounts are rounded.
Texans for Lawsuit Reform PAC
$135,000.00
- Cash
- $129,000.00
- Paid by others
- $6,000.00
- Total
- $135,000.00
Also funds 124 other sitting lawmakers.
Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.
Texans United for a Conservative Majority PAC
$116,000.00
- Cash
- $110,000.00
- Paid by others
- $6,000.00
- Total
- $116,000.00
Also funds 30 other sitting lawmakers.
Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101010195, 101033131, 101073278.
Bryan Hughes Campaign
$100,000.00
- Cash
- $100,000.00
- Paid by others
- $0.00
- Total
- $100,000.00
Also funds 0 other sitting lawmakers.
Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
Sources
Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101073278.
Votes
No floor vote loaded for this bill.
Fiscal
No fiscal note in the loaded record.
How this was graded
Analysis of text version I by a super-expensive superintelligence, Nov 9, 2026, against the published rubric.
Sources
Texas Senate · Filed Nov 9, 2026
11/09/2026 S Filed
Texas Legislature Online · Introduced
Data snapshot Nov 10, 2026 at 2:40 AM CST. Grades, charges, quotes and corrections follow the published record.
Subjects
Utilities--Electric
ELECTRIC RELIABILITY COUNCIL OF TEXAS (ERCOT)
PUBLIC UTILITY COMMISSION
Text
The text as introduced · 810 words
90R1342 CS-F By: Hall S.B. No. 191 A BILL TO BE ENTITLED AN ACT relating to the interconnection of a facility in the ERCOT power region to certain other facilities. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 37.051, Utilities Code, is amended by amending Subsections (c), (c-1), (c-2), and (c-3) and adding Subsection (c-4) to read as follows: (c) Notwithstanding any other provision of this chapter except Subsection (c-1) [ , including Subsection (a) ], an electric cooperative is not required to obtain a certificate of public convenience and necessity for the construction, installation, operation, or extension of any generating facilities or necessary interconnection facilities. (c-1) In this subsection, "facility" means a facility that consumes, generates, transmits, or distributes electricity. Notwithstanding any other provision of this title except Section 11.009, and except as provided by Subsection (c-3) [ (c-2) ], an electric cooperative, [ a person, including ] an electric utility , a [ or ] municipally owned utility , or another person [ , ] may not interconnect a facility in [ to ] the ERCOT power region to a facility located wholly or partly outside of this state or to a facility that is connected directly or indirectly with a facility located wholly or partly outside of this state, [ transmission grid that enables additional power to be imported into or exported out of the ERCOT power grid ] unless : (1) the proposed interconnection will not subject the ERCOT power region to additional federal control or jurisdiction; (2) the commission first determines that the proposed interconnection is in the public interest after considering: (A) the technical attributes of the proposed interconnection; (B) the expected costs to the public to install, operate, and maintain the interconnection; (C) the results of relevant criteria adopted by the commission under Section 37.056(d); (D) the results of a reliability assessment conducted by the independent organization certified under Section 39.151 for the ERCOT power region; and (E) any other information the commission considers appropriate; (3) the cooperative, utility, or person applies for a public interest determination from the commission under Subdivision (2) [ the person obtains a certificate from the commission stating that public convenience and necessity requires or will require the interconnection. The person must apply for the certificate ] not later than the 180th day before the date the cooperative, utility, or person seeks any order from the Federal Energy Regulatory Commission related to the proposed interconnection ; and (4) after the cooperative, utility, or person obtains any order from the Federal Energy Regulatory Commission related to the proposed interconnection, the commission grants a certificate stating that public convenience or necessity requires or will require the interconnection . (c-2) The commission shall apply Section 37.056 in considering an application under Subsection (c-1) [ this subsection ]. [ In addition, the commission must determine that the application is consistent with the public interest before granting the certificate. ] The commission may adopt rules necessary to implement Subsection (c-1) [ this subsection ]. Subsection (c-1) [ This subsection ] does not apply to a facility that is in service on December 31, 2014. (c-3) [ (c-2) ] The commission, not later than the 185th day after the date the application is filed, shall approve an application filed under Subsection (c-1) for a facility that is to be constructed under an interconnection agreement appended to an offer of settlement approved in a final order of the Federal Energy Regulatory Commission that was issued in Docket No. TX11-01-001 on or before December 31, 2014, directing physical connection between the ERCOT and SERC regions under Sections 210, 211, and 212 of the Federal Power Act (16 U.S.C. Sections 824i, 824j, and 824k). In approving the application, the commission may prescribe reasonable conditions to protect the public interest that are consistent with the final order of the Federal Energy Regulatory Commission. (c-4) [ (c-3) ] Nothing in Subsection (c-1) , [ or ] (c-2) , or (c-3) is intended to restrict the authority of the commission or the independent organization certified under Section 39.151 for the ERCOT power region to adopt rules or protocols of general applicability. SECTION 2. The changes in law made by this Act in Section 37.051, Utilities Code, apply only to an interconnection made on or after the effective date of this Act. An interconnection made before the effective date of this Act is governed by the law in effect when the interconnection was made, and the former law is continued in effect for that purpose. SECTION 3. This Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution. If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2027.