Monitoring the Session

HB 2766

Geren Inactive Wells Bill Gives Old Wells Until 2040

Died in committee

Verdict: Smells

SmellsNeeds review
Rep. Charlie GerenRHouse 99
Why it's charged
The hole

THE TEXT

“the inactive well is included in an approved compliance plan under Subsection (e), in which the operator of the well commits to plug, or restore to active operation, the inactive well within a time period ending on September 1, 2040”

Bill text, introduced version (I)

The wells this bill targets, those idle over 15 years and older than 25 years, can avoid the new limit through a compliance plan that only promises action by 2040. That allows up to another 15 years before plugging. A separate commission exception adds another way out.

The hole

Needs review · Nov 1, 2026 · Headline, summary and grade are analysis of the bill text, not a finding about any person · How we grade

Caption

relating to the plugging of certain inactive wells subject to the jurisdiction of the Railroad Commission of Texas.

Caption from analyzed text · version I.

Summary

Idle over 15 years? A plan to plug or restart by 2040 avoids the limit.

The bill bars operators from getting the usual extension on plugging an oil or gas well that has been inactive for more than 15 years and was completed more than 25 years ago, unless the Railroad Commission grants an exception or approves a compliance plan to plug or restart the well by September 1, 2040. It touches well operators with old idle wells and directs the Railroad Commission to write rules on well testing and well transfers and to send lawmakers a yearly report on inactive wells starting September 1, 2026. On the ground, old idle wells must be plugged, restarted, put under an exception, or placed in a plan, and operators must file a fluid level or integrity test report around the 15th year of inactivity.

Labels

Labels: ACROSS THE AISLE. Joint authors: 1 Republican, 2 Democrats. Party as the Legislative Reference Library lists it for the 89th Legislature.

Receipt

The receipt

89R-HB2766 · 2025-02-13

SOLD BY

+ 1 coauthor

ITEM

relating to the plugging of certain inactive wells subject to the jurisdiction of the Railroad Commission of Texas.

WHAT IT DOES

Idle over 15 years? A plan to plug or restart by 2040 avoids the limit.

The bill bars operators from getting the usual extension on plugging an oil or gas well that has been inactive for more than 15 years and was completed more than 25 years ago, unless the Railroad Commission grants an exception or approves a compliance plan to plug or restart the well by September 1, 2040. It touches well operators with old idle wells and directs the Railroad Commission to write rules on well testing and well transfers and to send lawmakers a yearly report on inactive wells starting September 1, 2026. On the ground, old idle wells must be plugged, restarted, put under an exception, or placed in a plan, and operators must file a fluid level or integrity test report around the 15th year of inactivity.

CHARGES

[x] THE HOLEanalysis confidence 50%

THE TEXT

“the inactive well is included in an approved compliance plan under Subsection (e), in which the operator of the well commits to plug, or restore to active operation, the inactive well within a time period ending on September 1, 2040”

Bill text, introduced version (I)

The wells this bill targets, those idle over 15 years and older than 25 years, can avoid the new limit through a compliance plan that only promises action by 2040. That allows up to another 15 years before plugging. A separate commission exception adds another way out.

TOTAL

Net to General Revenue · FY 2026$0

LBB estimate, flow · fiscal note version I · ( ) = negative · source

Sources

Fiscal note · version I · April 3, 2025

Estimated Two-year Net Impact to General Revenue Related Funds for HB2766, As Introduced: an impact of $0 through the biennium ending August 31, 2027. The bill would make no appropriation but could provide the legal basis for an appropriation of funds to implement the provisions of the bill.

First year · FY 2026 · $0

Probable Net Positive/(Negative) Impact to General Revenue Related Funds

LBB published estimates · flow over the stated periods.

Source snapshot 2026-10-19, Central time.

HISTORY

  1. Filed
  2. Read first time
  3. Referred to Energy Resources
  4. Scheduled for public hearing on . . .
  5. Considered in public hearing
  6. Testimony taken/registration(s) recorded in committee
  7. Left pending in committee
FILED UNDER

No verified beat found.

Smells

THANK YOU FOR CHECKING THE RECEIPT

CAMPAIGN PAID FOR BY

CAMPAIGN PAID FOR BY

Donors

Texas Trial Lawyers Association PAC$100KJon & Rebecca Brumley$50,000Michael Gallagher$40,000

Not tied to this bill.

Sources

The author's campaign account only. Own money and internal transfers are separate on the member page.

Derived itemized flow · Nov 5, 2024 to Oct 24, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Texas Trial Lawyers Association PAC$100,000.00

Texas Trial Lawyers Association PAC

$100,000.00

Cash
$100,000.00
Paid by others
$0.00
Total
$100,000.00

Also funds 137 other sitting lawmakers.

Derived recipient stock · Jul 24, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 26, 2025 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101004598, 101020024, 101055554, 101067438, 101071413.

Jon & Rebecca Brumley$50,000.00
Michael Gallagher$40,000.00
Money

Missing data does not establish zero giving. Display amounts are rounded.

×

Texas Trial Lawyers Association PAC

$100,000.00

Cash
$100,000.00
Paid by others
$0.00
Total
$100,000.00

Also funds 137 other sitting lawmakers.

Derived recipient stock · Jul 24, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 26, 2025 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101004598, 101020024, 101055554, 101067438, 101071413.

Votes

No floor vote loaded for this bill.

Fiscal
Net to General Revenue · FY 2026$0

LBB estimate, flow · fiscal note version I · ( ) = negative · source

Sources

Fiscal note · version I · April 3, 2025

Estimated Two-year Net Impact to General Revenue Related Funds for HB2766, As Introduced: an impact of $0 through the biennium ending August 31, 2027. The bill would make no appropriation but could provide the legal basis for an appropriation of funds to implement the provisions of the bill.

First year · FY 2026 · $0

Probable Net Positive/(Negative) Impact to General Revenue Related Funds

LBB published estimates · flow over the stated periods.

Source snapshot 2026-10-19, Central time.

How this was graded

Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.

Sources

Texas House · Filed Feb 13, 2025

04/07/2025 H Left pending in committee

Texas Legislature Online · Introduced

Data snapshot Nov 1, 2026 at 1:46 PM CST. Grades, charges, quotes and corrections follow the published record.

Coauthors

House committee · Energy Resources · Final status: Died in committee

Companion

SB 1150 by Middleton (identical)

Subjects

Oil & Gas

RAILROAD COMMISSION

Text

The text as introduced · 993 words

By: Geren
H.B. No. 2766

A BILL TO BE ENTITLED

AN ACT

relating to the plugging of certain inactive wells subject to the

jurisdiction of the Railroad Commission of Texas.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Section 89.023, Natural Resources Code, is

amended by amending Subsection (b) and adding Subsections (c)

through (g) to read as follows:

(b) Notwithstanding Subsection (a), an operator may not

obtain an extension of the deadline for plugging an inactive well by

complying with that subsection :

(1) if the plugging of the well is otherwise required

by commission rules or orders ; or

(2) if the inactive well:

(A) has been an inactive well for more than 15

years; and

(B) 25 years have elapsed since the well was

completed, unless:

(i) the commission approves an order

granting an applicant's exception to plugging the inactive well; or

(ii) the inactive well is included in an

approved compliance plan under Subsection (e), in which the

operator of the well commits to plug, or restore to active

operation, the inactive well within a time period ending on

September 1, 2040 .

(c) When considering a request under Subsection

(b)(2)(B)(i) for an exception to plugging an inactive well, the

commission shall consider an operator's demonstrated history of

returning inactive wells to active status.

(d) An exception approved by order of the commission under

Subsection (b)(2)(B)(i) is not transferrable to another operator

and shall terminate upon transfer of the well, except that a new

operator of that well may seek an additional exception under

Subsection (b) for that well.

(e) An operator may request the commission or its delegate

to approve a compliance plan for inactive wells. In approving a

compliance plan pursuant to Subsection (b)(2)(B)(ii), the

commission or its delegate shall consider the following factors:

(1) the number of years the well has been inactive and

its age;

(2) current economic conditions;

(3) the well operator's percentage of inactive wells

as compared to its total well count;

(4) any plan of action by the well operator to plug or

bring its inactive wells into production, injection, or other

service operation, which must include a compliance report to be

submitted to the commission annually with the operator's P-5

renewal;

(5) whether the operator has financial assurance to

cover the actual plugging costs of each well;

(6) the well operator's record of compliance, the

history of any previous violations, and the seriousness of any

previous violations;

(7) any potential hazards to the health and safety of

the public or environmental risks posed by the inactive well; and

(8) the demonstrated good faith of the well operator.

(f) If the commission or its delegate denies an operator's

request for approval of a compliance plan pursuant to Subsection

(e), the operator may request a hearing and order of the commission.

(g) The commission shall adopt rules that provide for

administrative review and approval of requests to transfer an

inactive well to another operator to ensure that wells of the

receiving operator are in compliance with this section.

SECTION 2. Subchapter B-1, Chapter 89, Natural Resources

Code, is amended by adding Section 89.031 to read as follows:

Sec. 89.031. ANNUAL REPORT BY COMMISSION. On or before

September 1, 2026, and each year thereafter, the commission shall

prepare and submit to the governor, lieutenant governor, and each

member of the legislature a report on inactive wells that includes:

(1) the number of inactive wells in Texas;

(2) the age and length of inactivity for the inactive

wells;

(3) the quantity of inactive wells that use each

method for extending the deadline under this chapter for plugging

inactive wells;

(4) the identification of the financial assurance

methods being used by operators for inactive wells under this

chapter, and the quantity of the number of inactive wells for each

category of financial assurance;

(5) the number of inactive wells and total wells that

were plugged in the prior 12 months, including a breakdown by

commission district of wells plugged by industry and by the

commission using state-managed funds;

(6) the number of inactive wells that were returned to

production, injection, or other service operation in the prior 12

months;

(7) P-5 status statistical summary of the number of

operators of inactive wells including the total number of operators

and total number of inactive wells for the status categories of

active P-5, P-5 Extension, Delinquent P-5, and P-5 delinquent

greater than 12 months;

(8) the number of P-5 Organization Reports revoked

under Section 91.114, the associated well count, the total amount

of financial assurance in place for those operators, and the amount

of financial assurance collected; and

(9) the annual cost calculation for plugging an

inactive well, as defined in Section 89.002 (a)(9).

SECTION 3. Subchapter B-1, Chapter 89, Natural Resources

Code, is amended by adding Section 89.032 to read as follows:

Sec. 89.032. COMMISSION RULEMAKING. (a) The commission

shall by rule adopt requirements for inactive wells. In its

rulemaking, the commission shall consider the following factors:

(1) risk to public safety and/or the environment;

(2) wellbore integrity and wellhead integrity

including the ability to monitor casing pressures; and

(3) regional considerations of risk such as

penetration of corrosive or overpressured formations, and

completion in zones containing hydrogen sulfide.

(b) The commission's rules shall include requirements that

within one year of the 15th anniversary of a well becoming inactive,

the operator of that well submit a report to the commission that:

(1) demonstrates completion of a successful fluid

level test or a mechanical integrity test of the well conducted in

accordance with the commission's rules in effect at the time of the

test, with a phase-in period for wells that require testing on the

effective date of the rule; and

(2) includes documentation of the results of a

successful fluid level test and reporting of pressure on the

production casing prior to testing.

SECTION 4. This Act takes effect September 1, 2025.