Groundwater cleanup values set and met for each production zone.
The bill rewrites the rule that lets some uranium mining permit applications skip a contested case hearing, now requiring that the groundwater cleanup values be set and met for each production zone named in the application. It touches uranium mining companies, the Texas Commission on Environmental Quality, and anyone who might want to challenge these mining approvals. It also repeals two subsections of the same Water Code section, whose contents are not shown in this text, and applies only to applications filed on or after September 1, 2025.
Labels
Labels: DO-OVER. Reworked text of a bill filed before that died: 88R HB 4119 (Did not pass). Filed in 2 sessions, counting this one. Checked against 88R only.TRY NO. 2. Filed in 2 sessions: 88R and 89R. Checked against 88R only.
relating to procedural requirements for uranium mining production
area authorizations.
WHAT IT DOES
Groundwater cleanup values set and met for each production zone.
The bill rewrites the rule that lets some uranium mining permit applications skip a contested case hearing, now requiring that the groundwater cleanup values be set and met for each production zone named in the application. It touches uranium mining companies, the Texas Commission on Environmental Quality, and anyone who might want to challenge these mining approvals. It also repeals two subsections of the same Water Code section, whose contents are not shown in this text, and applies only to applications filed on or after September 1, 2025.
CHARGES
[ ] NONE FOUND
TOTAL
No significant fiscal implication to the State is anticipated.
89R23 JAM-F
By: Guillen
H.B. No. 279
A BILL TO BE ENTITLED
AN ACT
relating to procedural requirements for uranium mining production
area authorizations.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
SECTION 1. Section 27.0513(d), Water Code, is amended to
read as follows:
(d) Notwithstanding Sections 5.551, 5.556, 27.011, and
27.018, an application for an authorization or an amendment to an
authorization that allows the permit holder to conduct mining and
restoration activities in production zones within the boundary
established in the permit is an uncontested matter not subject to a
contested case hearing or the hearing requirements of Chapter 2001,
Government Code, if:
(1) the authorization is for a production zone located
within the boundary of a permit that incorporates , for each
production zone addressed in the application, a range table of
groundwater quality restoration values used to measure groundwater
restoration by the commission;
(2) the application includes , for each production zone
addressed in the application, groundwater quality restoration
values falling at or below the upper limit of the range established
in Subdivision (1); and
(3) the authorization is for a production zone located
within the boundary of a permit that incorporates groundwater
baseline characteristics of the wells for the application required
by commission rule.
SECTION 2. Sections 27.0513(f) and (g), Water Code, are
repealed.
SECTION 3. The change in law made by this Act applies only
to an application for an authorization or an amendment to an
authorization that is submitted to the Texas Commission on
Environmental Quality on or after the effective date of this Act.
An application for an authorization or an amendment to an
authorization that was submitted to the commission before the
effective date of this Act is governed by the law in effect at the
time the application or amendment was submitted, and the former law
is continued in effect for that purpose.
SECTION 4. This Act takes effect September 1, 2025.