SB 1692
Hall’s Wind And Solar Cap Lets New Plants Past 35%
Died in committee
Verdict: Smells
Both charges, and why
The hole
THE TEXT
…“by Subsection (a), regardless of the goal described by Subsection”…
Bill text, introduced version (I)
The caption promises a limit on wind and solar capacity, but this clause lets new wind and solar be added past the 35 percent goal once older plants are forced off. Total capacity can climb back over the limit.
The holeDelayed start
The finding that triggers any limit is not due until 2029, well after the November 3, 2026 election. Nothing is limited until that finding is made and rules follow.
Delayed startInitial review · graded Oct 20, 2026 · Headline, summary and grade are analysis of the bill text, not a finding about any person · How we grade
Caption
relating to a limitation on wind and solar installed generation capacity in the ERCOT power region.
Caption from analyzed text · version I.
Summary
Older plants get forced off, then new ones can go back over. Finding due by 2029.
The bill tells the Public Utility Commission to check, by January 1, 2029, whether wind and solar plants supply more than 35 percent of available power on the ERCOT grid at any time, and if so, to write rules forcing some of those plants off the grid. Only wind and solar plants whose grid connection agreements were signed before September 1, 2025, can be ordered to disconnect, and the bill also points an existing generator rule at plants that sign on or after that date. Once the disconnection program is done, the commission may allow new wind and solar capacity even above the 35 percent goal, as long as the new plants follow that existing rule.
Labels
Labels: NEVER GOT A HEARING. Filed Feb 27, 2025 and referred to the Senate Business & Commerce committee. No public hearing. The bill died.
Receipt
The receipt
89R-SB1692 · 2025-02-27
SOLD BY
ITEM
relating to a limitation on wind and solar installed generation capacity in the ERCOT power region.
WHAT IT DOES
Older plants get forced off, then new ones can go back over. Finding due by 2029.
The bill tells the Public Utility Commission to check, by January 1, 2029, whether wind and solar plants supply more than 35 percent of available power on the ERCOT grid at any time, and if so, to write rules forcing some of those plants off the grid. Only wind and solar plants whose grid connection agreements were signed before September 1, 2025, can be ordered to disconnect, and the bill also points an existing generator rule at plants that sign on or after that date. Once the disconnection program is done, the commission may allow new wind and solar capacity even above the 35 percent goal, as long as the new plants follow that existing rule.
CHARGES
[x] THE HOLEanalysis confidence 65%
THE TEXT
…“by Subsection (a), regardless of the goal described by Subsection”…
Bill text, introduced version (I)
The caption promises a limit on wind and solar capacity, but this clause lets new wind and solar be added past the 35 percent goal once older plants are forced off. Total capacity can climb back over the limit.
[x] DELAYED STARTanalysis confidence 60%
The finding that triggers any limit is not due until 2029, well after the November 3, 2026 election. Nothing is limited until that finding is made and rules follow.
TOTAL
No fiscal note in the loaded record.
HISTORY
- Received by the Secretary of the Senate
- Filed
- Read first time
- Referred to Business & Commerce
FILED UNDER
DATA CENTERS, WATER AND THE GRID
THE TEXT
…“to require disconnection from the power grid of electric generation”…
Bill text, introduced version (I)
The bill sets up a state program to force existing wind and solar plants off the ERCOT grid if they pass a 35 percent share.
THANK YOU FOR CHECKING THE RECEIPT
CAMPAIGN PAID FOR BY
CAMPAIGN PAID FOR BY
Donors
Not tied to this bill.
Sources
The author's campaign account only. Own money and internal transfers are separate on the member page.
Derived itemized flow · Jul 1, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Texans for Lawsuit Reform PAC$135,000.00
Texans for Lawsuit Reform PAC
$135,000.00
- Cash
- $129,000.00
- Paid by others
- $6,000.00
- Total
- $135,000.00
Also funds 124 other sitting lawmakers.
Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.
Texans United for a Conservative Majority PAC$116,000.00
Texans United for a Conservative Majority PAC
$116,000.00
- Cash
- $110,000.00
- Paid by others
- $6,000.00
- Total
- $116,000.00
Also funds 30 other sitting lawmakers.
Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101010195, 101033131, 101073278.
Bryan Hughes Campaign$100,000.00
Bryan Hughes Campaign
$100,000.00
- Cash
- $100,000.00
- Paid by others
- $0.00
- Total
- $100,000.00
Also funds 0 other sitting lawmakers.
Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
Sources
Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101073278.
Missing data does not establish zero giving. Display amounts are rounded.
Texans for Lawsuit Reform PAC
$135,000.00
- Cash
- $129,000.00
- Paid by others
- $6,000.00
- Total
- $135,000.00
Also funds 124 other sitting lawmakers.
Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.
Texans United for a Conservative Majority PAC
$116,000.00
- Cash
- $110,000.00
- Paid by others
- $6,000.00
- Total
- $116,000.00
Also funds 30 other sitting lawmakers.
Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101010195, 101033131, 101073278.
Bryan Hughes Campaign
$100,000.00
- Cash
- $100,000.00
- Paid by others
- $0.00
- Total
- $100,000.00
Also funds 0 other sitting lawmakers.
Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
Sources
Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101073278.
Votes
No floor vote loaded for this bill.
Fiscal
No fiscal note in the loaded record.
How this was graded
Analysis of text version I by claude-opus-5-5, Oct 20, 2026, against the published rubric.
Sources
Texas Senate · Filed Feb 27, 2025
03/11/2025 S Referred to Business & Commerce
Texas Legislature Online · Introduced
Data snapshot Oct 26, 2026 at 4:20 AM CDT. Grades, charges, quotes and corrections follow the published record.
Senate committee · Business & Commerce · Final status: Died in committee
Subjects
Energy--Solar
Energy--Wind (IA9YE)
Utilities--Electric
Utilities--General
PUBLIC UTILITY COMMISSION
Text
The text as introduced · 452 words
89R10526 ANG-D By: Hall, Sparks S.B. No. 1692 A BILL TO BE ENTITLED AN ACT relating to a limitation on wind and solar installed generation capacity in the ERCOT power region. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Section 39.1592(a), Utilities Code, is amended to read as follows: (a) This section applies only to an electric generation facility in the ERCOT power region for which a standard generator interconnection agreement is signed on or after September 1, 2025 [ January 1, 2027, that has been in operation for at least one year ], and that is not a self-generator. SECTION 2. Subchapter D, Chapter 39, Utilities Code, is amended by adding Section 39.1596 to read as follows: Sec. 39.1596. LIMITATION ON WIND AND SOLAR GENERATION CAPACITY. (a) This section applies only to an electric generation facility that: (1) exclusively relies on an energy source derived from wind or the sun; and (2) is subject to a standard generator interconnection agreement. (b) Not later than January 1, 2029, the commission shall determine whether the installed generation capacity from the electric generation facilities described by Subsection (a) is contributing more than 35 percent of the available generation capacity for the ERCOT power region at any time. (c) If the commission determines the installed generation capacity described by Subsection (b) contributes more than 35 percent of the available generation capacity for the ERCOT power region at any time, the commission shall by rule establish a program to require disconnection from the power grid of electric generation facilities as provided by this subsection. The program must: (1) require the disconnection from the power grid of only facilities for which a standard generator interconnection agreement was signed before September 1, 2025; and (2) establish a goal of reducing the installed generation capacity from facilities for which a standard generator interconnection agreement was signed before September 1, 2025, so that the installed capacity from all electric generation facilities exclusively relying on an energy source derived from wind or the sun contributes 35 percent or less of the available generation capacity for the ERCOT power region at any time. (d) After completion of the program required under Subsection (c), the commission may allow the installation of new generation capacity from an electric generation facility described by Subsection (a), regardless of the goal described by Subsection (c)(2), if the facility complies with Section 39.1592. SECTION 3. This Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution. If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2025.