HB 1255
Lalani Bill Makes Big Data Centers Tell Neighbors Within Three Miles
Filed
Verdict: No flags
Initial review · graded Nov 19, 2026 · How we grade
Caption
relating to registration and community outreach requirements for large data centers.
Caption from analyzed text · version I.
Summary
250,000 square feet or more? Register, mail notices, hold a public meeting. No affidavit, no power hookup!
The bill makes anyone building a data center of at least 250,000 square feet register the site with the Public Utility Commission before construction starts. The developer must mail notice to property owners and homes within three miles, notify local and state officials, post signs and a website, hold a recorded public meeting, publish written answers to comments, and file a sworn affidavit with the commission. Power providers may not hook up the site until they receive that affidavit, and the commission can use its existing enforcement powers against developers or utilities that do not comply.
Receipt
The receipt
90R-HB1255 · 2026-11-19
SOLD BY
ITEM
relating to registration and community outreach requirements for large data centers.
WHAT IT DOES
250,000 square feet or more? Register, mail notices, hold a public meeting. No affidavit, no power hookup!
The bill makes anyone building a data center of at least 250,000 square feet register the site with the Public Utility Commission before construction starts. The developer must mail notice to property owners and homes within three miles, notify local and state officials, post signs and a website, hold a recorded public meeting, publish written answers to comments, and file a sworn affidavit with the commission. Power providers may not hook up the site until they receive that affidavit, and the commission can use its existing enforcement powers against developers or utilities that do not comply.
CHARGES
[ ] NONE FOUND
TOTAL
No fiscal note in the loaded record.
HISTORY
2026-11-19 Filed (per the TLO filing feed)
FILED UNDER
DATA CENTERS, WATER AND THE GRID
THE TEXT
…“municipally owned utility may not interconnect facilities at a site”…
Bill text, introduced version (I)
The bill bars electric providers from connecting a large data center to the grid until the developer has notified neighbors, held a public meeting and filed a sworn affidavit with the commission.
THANK YOU FOR CHECKING THE RECEIPT
CAMPAIGN PAID FOR BY
CAMPAIGN PAID FOR BY
Donors
Not tied to this bill.
Sources
The author's campaign account only. Own money and internal transfers are separate on the member page.
Derived itemized flow · Oct 28, 2024 to Oct 24, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Texas Trial Lawyers Association PAC$37,500.00
Texas Trial Lawyers Association PAC
$37,500.00
- Cash
- $37,500.00
- Paid by others
- $0.00
- Total
- $37,500.00
Also funds 137 other sitting lawmakers.
Derived recipient stock · Jul 24, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Dec 10, 2024 to Aug 31, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987680, 101007262, 101030846, 101036309, 101069420.
Texas House Democratic Campaign Committee$11,569.08
Texas House Democratic Campaign Committee
$11,569.08
- Cash
- $7,000.00
- Paid by others
- $4,569.08
- Total
- $11,569.08
Also funds 9 other sitting lawmakers.
Derived recipient stock · Oct 15, 2024 to Oct 15, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
TeamSources
Derived itemized flow · Feb 3, 2026 to Jun 2, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101040256, 101061992.
TSA PAC$10,000.00
TSA PAC
$10,000.00
- Cash
- $10,000.00
- Paid by others
- $0.00
- Total
- $10,000.00
Also funds 15 other sitting lawmakers.
Derived recipient stock · Oct 1, 2024 to Oct 10, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
TeamSources
Derived itemized flow · Sep 23, 2025 to Oct 10, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101030846, 101072241.
Missing data does not establish zero giving. Display amounts are rounded.
Texas Trial Lawyers Association PAC
$37,500.00
- Cash
- $37,500.00
- Paid by others
- $0.00
- Total
- $37,500.00
Also funds 137 other sitting lawmakers.
Derived recipient stock · Jul 24, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamSources
Derived itemized flow · Dec 10, 2024 to Aug 31, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987680, 101007262, 101030846, 101036309, 101069420.
Texas House Democratic Campaign Committee
$11,569.08
- Cash
- $7,000.00
- Paid by others
- $4,569.08
- Total
- $11,569.08
Also funds 9 other sitting lawmakers.
Derived recipient stock · Oct 15, 2024 to Oct 15, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
TeamSources
Derived itemized flow · Feb 3, 2026 to Jun 2, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101040256, 101061992.
TSA PAC
$10,000.00
- Cash
- $10,000.00
- Paid by others
- $0.00
- Total
- $10,000.00
Also funds 15 other sitting lawmakers.
Derived recipient stock · Oct 1, 2024 to Oct 10, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
TeamSources
Derived itemized flow · Sep 23, 2025 to Oct 10, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101030846, 101072241.
Votes
No floor vote loaded for this bill.
Fiscal
No fiscal note in the loaded record.
How this was graded
Analysis of text version I by a super-expensive superintelligence, Nov 19, 2026, against the published rubric.
Sources
Texas House · Filed Nov 19, 2026
2026-11-19 Filed (per the TLO filing feed)
Texas Legislature Online · Introduced text: HTML · PDF
Data snapshot Nov 19, 2026 at 5:08 PM CST. Grades, charges, quotes and corrections follow the published record.
Text
The text as introduced · 1,349 words
90R4632 ANG-D By: Lalani H.B. No. 1255 A BILL TO BE ENTITLED AN ACT relating to registration and community outreach requirements for large data centers. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. The Utilities Code is amended by adding Title 7 to read as follows: TITLE 7. DATA CENTERS CHAPTER 401. DATA CENTER REGISTRATION AND COMMUNITY ENGAGEMENT NOTICE REQUIREMENTS SUBCHAPTER A. GENERAL PROVISIONS Sec. 401.001. DEFINITIONS. In this title: (1) "Commission" means the Public Utility Commission of Texas. (2) "Developer" means a person who owns, develops, or proposes to develop a large data center. (3) "Electric cooperative" has the meaning assigned by Section 11.003. (4) "Electric utility" has the meaning assigned by Section 31.002. (5) "Large data center" means a facility or group of facilities on a single parcel or contiguous parcels of land under common ownership or control that: (A) comprises at least 250,000 square feet of space; and (B) is constructed or refurbished primarily to house servers and related equipment for the processing, storage, or distribution of data. (6) "Municipally owned utility" has the meaning assigned by Section 11.003. SUBCHAPTER B. REGISTRATION Sec. 401.051. REGISTRATION. (a) The commission by rule shall: (1) require a developer to register the site of a large data center under this section before construction of the data center begins; and (2) establish a method to ensure compliance with this section. (b) The rules must require the developer, before beginning construction of the large data center, to: (1) notify the community about the construction of the large data center as provided by Section 401.101; (2) hold a community meeting as provided by Section 401.102; and (3) submit an affidavit to the commission in accordance with Section 401.104 stating that the developer has complied with the requirements of Subchapter C. SUBCHAPTER C. COMMUNITY OUTREACH REQUIREMENTS Sec. 401.101. NOTIFICATION REQUIREMENTS. (a) Not later than the 60th day before holding a community meeting as required by Section 401.102, a developer shall: (1) send written notice of the proposed construction of the large data center: (A) by first-class mail to each owner of real property located wholly or partly within three miles of the boundary on which the proposed data center will be located, using the most recent certified appraisal roll of the appraisal district in which the property is located; and (B) by first-class mail or direct delivery to each residential address located within three miles of the boundary of the proposed large data center; (2) provide written notice of the proposed construction of the large data center to: (A) the county judge of the county in which the proposed large data center will be located; (B) the county commissioner who represents the county precinct in which the proposed large data center will be located; (C) the mayor of the municipality in which the proposed large data center will be located, if applicable; (D) each member of the legislature who represents the area in which the proposed large data center will be located; and (E) any other political subdivisions in which the proposed large data center will be located; (3) publish notice of the proposed construction of the large data center in a newspaper or news publication of general circulation in the county in which the proposed large data center will be located; (4) post a sign providing notice of the proposed construction of the large data center in a conspicuous location at the site of the proposed data center in a location that is visible from a regularly traveled public road; and (5) post a written notice of the proposed construction of and information regarding the proposed large data center, including information regarding the community meeting, on a publicly available Internet website maintained by or operated on behalf of the developer. (b) Notice provided under this section must include: (1) the developer's name and contact information; (2) the location of the proposed large data center; (3) a description in plain language of the proposed large data center; (4) the anticipated square footage of the proposed large data center; (5) the date, time, and location of the planned community meeting required by Section 401.102; (6) a description of the manner in which a person may submit questions or written comments to the developer regarding the proposed large data center; and (7) the Internet website address at which information regarding the proposed large data center and the community meeting may be found. Sec. 401.102. COMMUNITY MEETING REQUIRED. (a) A developer shall hold at least one public community meeting before beginning construction of a proposed large data center. (b) A community meeting held under this section must be held in the county in which the proposed large data center will be located and at a location reasonably accessible to residents who are entitled to notice under Section 401.101. At the meeting, the developer shall: (1) describe the proposed large data center; and (2) provide members of the public: (A) a reasonable opportunity to ask questions regarding the proposed large data center; and (B) an opportunity to: (i) provide oral comments on the proposed large data center to the developer; and (ii) submit written comments on the proposed large data center to the developer. (c) The developer shall accept written comments on the proposed large data center beginning on the date notice is provided under Section 401.101 and until at least the 10th business day after the date of the community meeting held under this section. (d) A developer of a large data center or a representative of the developer must attend the community meeting held under this section. The developer or the developer's representative must: (1) be knowledgeable regarding the proposed large data center; and (2) make a reasonable effort to respond to questions relevant to the proposed large data center. (e) The developer shall make an audio or video recording of the community meeting held under this section. (f) Not later than the 40th day after the date of the community meeting held under this section, the developer shall publish on a publicly available Internet website maintained by or operated on behalf of the developer: (1) the audio or video recording of the meeting; (2) a copy or a summary of the written comments received by the developer; and (3) a written response provided by the developer addressing each relevant and material issue raised by an oral or written comment. (g) The purpose of a community meeting held under this section is to provide information to the public and allow the public to provide input to the developer. The community meeting is not a governmental meeting subject to the meeting or hearing requirements of the Government Code applicable to meetings held by governmental entities. Sec. 401.103. COSTS. A developer is responsible for all costs required for compliance with this subchapter. Sec. 401.104. AFFIDAVIT OF COMPLIANCE. (a) A developer shall submit to the commission a sworn affidavit that the developer has complied with the notice and community meeting requirements under this subchapter. (b) The commission shall verify that the information in the sworn affidavit is correct and share the affidavit with the electric cooperative, electric utility, or municipally owned utility the developer proposes to receive electric service from at the proposed large data center site. (c) An electric cooperative, electric utility, or municipally owned utility may not interconnect facilities at a site on which a large data center is or will be located before receiving a copy of the developer's affidavit from the commission. SUBCHAPTER D. ENFORCEMENT Sec. 401.152. ENFORCEMENT. For purposes of this chapter, a reference in Chapter 15 to a person includes a developer required to register under this chapter. The commission may use any enforcement mechanism authorized by Chapter 15 against a developer, electric cooperative, electric utility, or municipally owned utility that fails to comply with this chapter. SECTION 2. Title 7, Utilities Code, as added by this Act, applies only to a large data center the construction of which begins on or after the effective date of this Act. SECTION 3. This Act takes effect September 1, 2027.