Hall Bill Makes Wind And Solar Plants Get A Permit First

Filed

Verdict: No flags

No flagsInitial review
Sen. Bob HallRSenate 2

Initial review · graded Nov 19, 2026 · How we grade

Caption

relating to the permitting of renewable energy generation facilities; authorizing fees.

Caption from analyzed text · version I.

Summary

No grid hookup without a commission permit. Setbacks from homes unless neighbors sign waivers, plus a fee.

This bill makes anyone who wants to connect a wind, solar, battery storage or other renewable power plant to the transmission grid first get a permit from the Public Utility Commission, and charges applicants a fee set by the commission. It touches developers, electric cooperatives and city-owned utilities that build these plants to sell power wholesale, along with the neighbors, counties and fire departments near the sites. On the ground, projects must meet setback rules from property lines, homes and hazards unless neighbors sign waivers, must not block the only road into a neighborhood, must notify local first responders and carry insurance, and neighbors can file complaints with the commission.

Labels

Labels: DO-OVER. Reworked text of a bill filed before that died: 89R SB 1979 (Died in committee). Filed in 2 sessions, counting this one. Checked against 88R and 89R only.TRY NO. 2. Filed in 2 sessions: 89R and 90R. Checked against 88R and 89R only.FEE INCLUDED. The caption of the graded version (introduced) reads: “relating to the permitting of renewable energy generation facilities; authorizing fees.”

Receipt

The receipt

90R-SB435 · 2026-11-19

SOLD BY

ITEM

relating to the permitting of renewable energy generation facilities; authorizing fees.

WHAT IT DOES

No grid hookup without a commission permit. Setbacks from homes unless neighbors sign waivers, plus a fee.

This bill makes anyone who wants to connect a wind, solar, battery storage or other renewable power plant to the transmission grid first get a permit from the Public Utility Commission, and charges applicants a fee set by the commission. It touches developers, electric cooperatives and city-owned utilities that build these plants to sell power wholesale, along with the neighbors, counties and fire departments near the sites. On the ground, projects must meet setback rules from property lines, homes and hazards unless neighbors sign waivers, must not block the only road into a neighborhood, must notify local first responders and carry insurance, and neighbors can file complaints with the commission.

CHARGES

[ ] NONE FOUND

TOTAL

No fiscal note in the loaded record.

HISTORY

2026-11-19 Filed (per the TLO filing feed)

ALSO NOTED · NOT CHARGED (1)

NEW FEE, FUND, BOARD OR APPOINTEES · analysis confidence 40%

THE TEXT

“The commission by rule shall adopt a fee to be imposed on each permit applicant to cover costs associated with implementing this section.”

Bill text, introduced version (I)

The bill creates a new permit fee, but the caption says plainly that it is "authorizing fees," so this is disclosed and ordinary for a permit program.

FILED UNDER

DATA CENTERS, WATER AND THE GRID

THE TEXT

“A person may not interconnect a renewable energy generation facility to a transmission facility unless the person holds a permit to operate a renewable energy generation facility issued by the commission under this subchapter.”

Bill text, introduced version (I)

The bill puts a new state permit gate in front of renewable power plants before they can connect to the transmission grid.

No flags

THANK YOU FOR CHECKING THE RECEIPT

CAMPAIGN PAID FOR BY

CAMPAIGN PAID FOR BY

Donors

Not tied to this bill.

Sources

The author's campaign account only. Own money and internal transfers are separate on the member page.

Derived itemized flow · Jul 1, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Texans for Lawsuit Reform PAC$135,000.00

Texans for Lawsuit Reform PAC

$135,000.00

Cash
$129,000.00
Paid by others
$6,000.00
Total
$135,000.00
polling $6,000.00

Also funds 124 other sitting lawmakers.

Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.

Texans United for a Conservative Majority PAC$116,000.00

Texans United for a Conservative Majority PAC

$116,000.00

Cash
$110,000.00
Paid by others
$6,000.00
Total
$116,000.00
polling $6,000.00

Also funds 30 other sitting lawmakers.

Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101010195, 101033131, 101073278.

Bryan Hughes Campaign$100,000.00

Bryan Hughes Campaign

$100,000.00

Cash
$100,000.00
Paid by others
$0.00
Total
$100,000.00

Also funds 0 other sitting lawmakers.

Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073278.

Money

Missing data does not establish zero giving. Display amounts are rounded.

×

Texans for Lawsuit Reform PAC

$135,000.00

Cash
$129,000.00
Paid by others
$6,000.00
Total
$135,000.00
polling $6,000.00

Also funds 124 other sitting lawmakers.

Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.

×

Texans United for a Conservative Majority PAC

$116,000.00

Cash
$110,000.00
Paid by others
$6,000.00
Total
$116,000.00
polling $6,000.00

Also funds 30 other sitting lawmakers.

Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.

TEC account match.

Team
Sources

Derived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101010195, 101033131, 101073278.

×

Bryan Hughes Campaign

$100,000.00

Cash
$100,000.00
Paid by others
$0.00
Total
$100,000.00

Also funds 0 other sitting lawmakers.

Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Name match, not a verified identity: normalized filed name and state.

Sources

Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.

Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.

Report IDs: 101073278.

Votes

No floor vote loaded for this bill.

Fiscal

No fiscal note in the loaded record.

How this was graded

Analysis of text version I by a super-expensive superintelligence, Nov 19, 2026, against the published rubric.

FILED BEFORE

Filed 2 times: 89R and now. Checked against 88R and 89R only.

89R SB 1979

by Sen. Hall, same lead author · Died in committee · reworked

Introduced text

Last action, Mar 17, 2025: Referred to Business & Commerce

Relating to renewable energy generation facilities; authorizing fees.

Caption, 89R bill history

Comments

Reader comments, text only. New comments show a generated Texas name. Links, threats and private details wait for the editor, and slurs and spam are turned away. Nothing is screened for opinion. How comments work.

Loading comments.

Sources

Texas Senate · Filed Nov 19, 2026

2026-11-19 Filed (per the TLO filing feed)

Texas Legislature Online · Introduced text: HTML · PDF

Data snapshot Nov 19, 2026 at 5:07 PM CST. Grades, charges, quotes and corrections follow the published record.

Text

The text as introduced · 1,288 words

90R1028 SCR-F

By: Hall
S.B. No. 435

A BILL TO BE ENTITLED

AN ACT

relating to the permitting of renewable energy generation

facilities; authorizing fees.

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:

SECTION 1. Subchapter C, Chapter 15, Utilities Code, is

amended by adding Section 15.053 to read as follows:

Sec. 15.053. COMPLAINT REGARDING RENEWABLE ENERGY

GENERATION FACILITIES. (a) An affected person may complain to the

commission in writing setting forth an act or omission by an owner

or operator of a renewable energy generation facility in violation

or claimed violation of Subchapter F, Chapter 35.

(b) The commission shall keep for a reasonable period an

information file about each complaint filed with the commission

relating to an owner or operator of a renewable energy generation

facility.

(c) The commission, at least quarterly and until final

disposition of the written complaint, shall notify the parties to

the complaint of the status of the complaint unless the notice would

jeopardize an undercover investigation.

SECTION 2. Chapter 35, Utilities Code, is amended by adding

Subchapter F to read as follows:

SUBCHAPTER F. RENEWABLE ENERGY GENERATION FACILITY PERMIT

Sec. 35.201. DEFINITIONS; APPLICABILITY. (a) In this

subchapter:

(1) "Permit holder" means a person who holds a permit

issued under this subchapter.

(2) "Person" includes an electric cooperative and a

municipally owned utility.

(3) "Renewable energy generation facility" means:

(A) a wind power facility as defined by Section

301.0001;

(B) a solar power facility as defined by Section

302.0001;

(C) a battery energy storage facility as defined

by Section 303.0001 or another type of electric energy storage

facility; or

(D) a renewable power facility.

(4) "Renewable power facility" means a facility that:

(A) generates electric energy using a renewable

energy technology, as defined by Section 39.916, other than a

technology that relies exclusively on wind or solar energy; and

(B) is not an electric energy storage facility.

(b) The permit requirements of this subchapter apply to a

renewable energy generation facility regardless of whether the

facility is the subject of a facility agreement entered into under

Chapter 301, 302, or 303.

(c) This subchapter applies only to a renewable energy

generation facility that is intended to be used to sell energy or

ancillary services at wholesale.

Sec. 35.202. PERMIT REQUIRED. (a) A person may not

interconnect a renewable energy generation facility to a

transmission facility unless the person holds a permit to operate a

renewable energy generation facility issued by the commission under

this subchapter.

(b) The commission by rule shall require each permitted

renewable energy generation facility to be installed only in a

location that:

(1) for a solar power facility, is at least:

(A) 500 feet from any property line, unless the

permit holder has obtained a written waiver from each owner of

property located less than 500 feet from the permitted facility;

and

(B) 500 feet from any habitable structure, unless

the permit holder has obtained a written waiver from each owner of

the habitable structure;

(2) for a wind power facility, is at least twice the

height of the wind turbine, including the blades of the turbine,

from the property line of each property that borders the property on

which the permitted facility is located, unless the permit holder

has obtained a written waiver from each owner of property located in

the applicable area; and

(3) for a battery energy storage facility, is at

least:

(A) 500 feet from any property line, unless the

permit holder has obtained a written waiver from each owner of

property located less than 500 feet from the permitted facility;

and

(B) 500 feet from:

(i) public ways;

(ii) buildings;

(iii) stored combustible materials;

(iv) hazardous materials;

(v) high-piled stock; and

(vi) other exposure hazards not associated

with electrical grid infrastructure.

(c) The commission by rule shall require:

(1) each permitted renewable energy generation

facility to be installed only in a location that, in the event of an

emergency at the site of the permitted renewable energy generation

facility, will not block the only access point to a residential

area; or

(2) an alternate access point to be constructed for

any residential area in which an emergency at the site of the

permitted facility could block the only access point to the

residential area.

(d) A person may apply for a permit under this subchapter by

filing with the commission:

(1) a description of the proposed location of the

renewable energy generation facility;

(2) a description of the type of renewable energy

generation facility;

(3) a statement identifying the fire department, as

defined by Section 419.021, Government Code, volunteer fire

department, fire marshal, or other first responder entity that may

reasonably be expected to be the primary first responder to a fire

at the location of the renewable energy generation facility;

(4) a statement that the person has provided written

notice to the entity identified in Subdivision (3) of the

applicant's intent to install a renewable energy generation

facility;

(5) evidence of insurance coverage sufficient to

insure against losses arising from the operation of the renewable

energy generation facility; and

(6) any other information required by commission rule.

(e) When an application for a permit, or an amendment to a

permit issued under this section, is filed, the commission shall

give notice of the application to the county judge of the county in

which all or a majority of the renewable energy generation facility

is proposed to be located. The county shall publish the notice in

at least three consecutive issues of a newspaper with general

circulation in the county. The county shall also publish the notice

on the county's Internet website. The county may not remove the

notice from its Internet website after publication.

(f) The commission may hold one or more public meetings on a

permit application in the county in which the renewable energy

generation facility is proposed to be located. The commission

shall hold a public meeting:

(1) on the request of a member of the legislature who

represents the area in which the renewable energy generation

facility is proposed to be located; or

(2) if the commission determines there is substantial

public interest in the proposed permit.

(g) The commission by order or rule may delegate to the

executive director or another commission employee the authority to

hold a public meeting under this section.

(h) The commission may approve an application for a permit

only if the commission finds that:

(1) issuance of the permit would not violate state or

federal law; and

(2) the location of the proposed renewable energy

generation facility complies with rules adopted under Subsections

(b) and (c).

(i) The commission by rule shall adopt a fee to be imposed on

each permit applicant to cover costs associated with implementing

this section.

(j) For purposes of this subchapter:

(1) a provision of Subchapter B or E, Chapter 14, that

authorizes the commission to regulate a public utility also applies

to a person required to obtain a permit under this section,

including an electric cooperative or a municipally owned utility;

and

(2) a reference in Chapter 15 to a person includes a

person required to obtain a permit under this section, including an

electric cooperative or a municipally owned utility.

SECTION 3. As soon as practicable after the effective date

of this Act, the Public Utility Commission of Texas shall adopt

rules to effectuate the changes in law made by this Act.

SECTION 4. This Act takes effect immediately if it receives

a vote of two-thirds of all the members elected to each house, as

provided by Section 39, Article III, Texas Constitution. If this

Act does not receive the vote necessary for immediate effect, this

Act takes effect September 1, 2027.