89R SB 1979
by Sen. Hall, same lead author · Died in committee · reworked
Introduced textLast action, Mar 17, 2025: Referred to Business & Commerce
Relating to renewable energy generation facilities; authorizing fees.
Caption, 89R bill history
SB 435
Filed
Initial review · graded Nov 19, 2026 · How we grade
relating to the permitting of renewable energy generation facilities; authorizing fees.
Caption from analyzed text · version I.
No grid hookup without a commission permit. Setbacks from homes unless neighbors sign waivers, plus a fee.
This bill makes anyone who wants to connect a wind, solar, battery storage or other renewable power plant to the transmission grid first get a permit from the Public Utility Commission, and charges applicants a fee set by the commission. It touches developers, electric cooperatives and city-owned utilities that build these plants to sell power wholesale, along with the neighbors, counties and fire departments near the sites. On the ground, projects must meet setback rules from property lines, homes and hazards unless neighbors sign waivers, must not block the only road into a neighborhood, must notify local first responders and carry insurance, and neighbors can file complaints with the commission.
Labels: DO-OVER. Reworked text of a bill filed before that died: 89R SB 1979 (Died in committee). Filed in 2 sessions, counting this one. Checked against 88R and 89R only.TRY NO. 2. Filed in 2 sessions: 89R and 90R. Checked against 88R and 89R only.FEE INCLUDED. The caption of the graded version (introduced) reads: “relating to the permitting of renewable energy generation facilities; authorizing fees.”
90R-SB435 · 2026-11-19
relating to the permitting of renewable energy generation facilities; authorizing fees.
No grid hookup without a commission permit. Setbacks from homes unless neighbors sign waivers, plus a fee.
This bill makes anyone who wants to connect a wind, solar, battery storage or other renewable power plant to the transmission grid first get a permit from the Public Utility Commission, and charges applicants a fee set by the commission. It touches developers, electric cooperatives and city-owned utilities that build these plants to sell power wholesale, along with the neighbors, counties and fire departments near the sites. On the ground, projects must meet setback rules from property lines, homes and hazards unless neighbors sign waivers, must not block the only road into a neighborhood, must notify local first responders and carry insurance, and neighbors can file complaints with the commission.
[ ] NONE FOUND
No fiscal note in the loaded record.
2026-11-19 Filed (per the TLO filing feed)
NEW FEE, FUND, BOARD OR APPOINTEES · analysis confidence 40%
THE TEXT
“The commission by rule shall adopt a fee to be imposed on each permit applicant to cover costs associated with implementing this section.”
Bill text, introduced version (I)
The bill creates a new permit fee, but the caption says plainly that it is "authorizing fees," so this is disclosed and ordinary for a permit program.
DATA CENTERS, WATER AND THE GRID
THE TEXT
“A person may not interconnect a renewable energy generation facility to a transmission facility unless the person holds a permit to operate a renewable energy generation facility issued by the commission under this subchapter.”
Bill text, introduced version (I)
The bill puts a new state permit gate in front of renewable power plants before they can connect to the transmission grid.
THANK YOU FOR CHECKING THE RECEIPT
CAMPAIGN PAID FOR BY
Not tied to this bill.
The author's campaign account only. Own money and internal transfers are separate on the member page.
Derived itemized flow · Jul 1, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
$135,000.00
Also funds 124 other sitting lawmakers.
Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamDerived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.
$116,000.00
Also funds 30 other sitting lawmakers.
Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamDerived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101010195, 101033131, 101073278.
$100,000.00
Also funds 0 other sitting lawmakers.
Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101073278.
Missing data does not establish zero giving. Display amounts are rounded.
$135,000.00
Also funds 124 other sitting lawmakers.
Derived recipient stock · Jul 10, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamDerived itemized flow · Sep 12, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 100987789, 101010195, 101040645, 101069307, 101073278.
$116,000.00
Also funds 30 other sitting lawmakers.
Derived recipient stock · Sep 3, 2024 to Oct 23, 2026. State data as of Nov 4, 2026.
TEC account match.
TeamDerived itemized flow · Jun 27, 2025 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101010195, 101033131, 101073278.
$100,000.00
Also funds 0 other sitting lawmakers.
Derived recipient stock · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Name match, not a verified identity: normalized filed name and state.
Derived itemized flow · Sep 29, 2026 to Oct 5, 2026. State data as of Nov 4, 2026.
Derived itemized contributions on live regular reports and uncovered special-session dates. Internal account transfers and daily reports are excluded.
Report IDs: 101073278.
No floor vote loaded for this bill.
No fiscal note in the loaded record.
Analysis of text version I by a super-expensive superintelligence, Nov 19, 2026, against the published rubric.
Filed 2 times: 89R and now. Checked against 88R and 89R only.
by Sen. Hall, same lead author · Died in committee · reworked
Introduced textLast action, Mar 17, 2025: Referred to Business & Commerce
Relating to renewable energy generation facilities; authorizing fees.
Caption, 89R bill history
Texas Senate · Filed Nov 19, 2026
2026-11-19 Filed (per the TLO filing feed)
Texas Legislature Online · Introduced text: HTML · PDF
Data snapshot Nov 19, 2026 at 5:07 PM CST. Grades, charges, quotes and corrections follow the published record.
The text as introduced · 1,288 words
90R1028 SCR-F By: Hall S.B. No. 435 A BILL TO BE ENTITLED AN ACT relating to the permitting of renewable energy generation facilities; authorizing fees. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: SECTION 1. Subchapter C, Chapter 15, Utilities Code, is amended by adding Section 15.053 to read as follows: Sec. 15.053. COMPLAINT REGARDING RENEWABLE ENERGY GENERATION FACILITIES. (a) An affected person may complain to the commission in writing setting forth an act or omission by an owner or operator of a renewable energy generation facility in violation or claimed violation of Subchapter F, Chapter 35. (b) The commission shall keep for a reasonable period an information file about each complaint filed with the commission relating to an owner or operator of a renewable energy generation facility. (c) The commission, at least quarterly and until final disposition of the written complaint, shall notify the parties to the complaint of the status of the complaint unless the notice would jeopardize an undercover investigation. SECTION 2. Chapter 35, Utilities Code, is amended by adding Subchapter F to read as follows: SUBCHAPTER F. RENEWABLE ENERGY GENERATION FACILITY PERMIT Sec. 35.201. DEFINITIONS; APPLICABILITY. (a) In this subchapter: (1) "Permit holder" means a person who holds a permit issued under this subchapter. (2) "Person" includes an electric cooperative and a municipally owned utility. (3) "Renewable energy generation facility" means: (A) a wind power facility as defined by Section 301.0001; (B) a solar power facility as defined by Section 302.0001; (C) a battery energy storage facility as defined by Section 303.0001 or another type of electric energy storage facility; or (D) a renewable power facility. (4) "Renewable power facility" means a facility that: (A) generates electric energy using a renewable energy technology, as defined by Section 39.916, other than a technology that relies exclusively on wind or solar energy; and (B) is not an electric energy storage facility. (b) The permit requirements of this subchapter apply to a renewable energy generation facility regardless of whether the facility is the subject of a facility agreement entered into under Chapter 301, 302, or 303. (c) This subchapter applies only to a renewable energy generation facility that is intended to be used to sell energy or ancillary services at wholesale. Sec. 35.202. PERMIT REQUIRED. (a) A person may not interconnect a renewable energy generation facility to a transmission facility unless the person holds a permit to operate a renewable energy generation facility issued by the commission under this subchapter. (b) The commission by rule shall require each permitted renewable energy generation facility to be installed only in a location that: (1) for a solar power facility, is at least: (A) 500 feet from any property line, unless the permit holder has obtained a written waiver from each owner of property located less than 500 feet from the permitted facility; and (B) 500 feet from any habitable structure, unless the permit holder has obtained a written waiver from each owner of the habitable structure; (2) for a wind power facility, is at least twice the height of the wind turbine, including the blades of the turbine, from the property line of each property that borders the property on which the permitted facility is located, unless the permit holder has obtained a written waiver from each owner of property located in the applicable area; and (3) for a battery energy storage facility, is at least: (A) 500 feet from any property line, unless the permit holder has obtained a written waiver from each owner of property located less than 500 feet from the permitted facility; and (B) 500 feet from: (i) public ways; (ii) buildings; (iii) stored combustible materials; (iv) hazardous materials; (v) high-piled stock; and (vi) other exposure hazards not associated with electrical grid infrastructure. (c) The commission by rule shall require: (1) each permitted renewable energy generation facility to be installed only in a location that, in the event of an emergency at the site of the permitted renewable energy generation facility, will not block the only access point to a residential area; or (2) an alternate access point to be constructed for any residential area in which an emergency at the site of the permitted facility could block the only access point to the residential area. (d) A person may apply for a permit under this subchapter by filing with the commission: (1) a description of the proposed location of the renewable energy generation facility; (2) a description of the type of renewable energy generation facility; (3) a statement identifying the fire department, as defined by Section 419.021, Government Code, volunteer fire department, fire marshal, or other first responder entity that may reasonably be expected to be the primary first responder to a fire at the location of the renewable energy generation facility; (4) a statement that the person has provided written notice to the entity identified in Subdivision (3) of the applicant's intent to install a renewable energy generation facility; (5) evidence of insurance coverage sufficient to insure against losses arising from the operation of the renewable energy generation facility; and (6) any other information required by commission rule. (e) When an application for a permit, or an amendment to a permit issued under this section, is filed, the commission shall give notice of the application to the county judge of the county in which all or a majority of the renewable energy generation facility is proposed to be located. The county shall publish the notice in at least three consecutive issues of a newspaper with general circulation in the county. The county shall also publish the notice on the county's Internet website. The county may not remove the notice from its Internet website after publication. (f) The commission may hold one or more public meetings on a permit application in the county in which the renewable energy generation facility is proposed to be located. The commission shall hold a public meeting: (1) on the request of a member of the legislature who represents the area in which the renewable energy generation facility is proposed to be located; or (2) if the commission determines there is substantial public interest in the proposed permit. (g) The commission by order or rule may delegate to the executive director or another commission employee the authority to hold a public meeting under this section. (h) The commission may approve an application for a permit only if the commission finds that: (1) issuance of the permit would not violate state or federal law; and (2) the location of the proposed renewable energy generation facility complies with rules adopted under Subsections (b) and (c). (i) The commission by rule shall adopt a fee to be imposed on each permit applicant to cover costs associated with implementing this section. (j) For purposes of this subchapter: (1) a provision of Subchapter B or E, Chapter 14, that authorizes the commission to regulate a public utility also applies to a person required to obtain a permit under this section, including an electric cooperative or a municipally owned utility; and (2) a reference in Chapter 15 to a person includes a person required to obtain a permit under this section, including an electric cooperative or a municipally owned utility. SECTION 3. As soon as practicable after the effective date of this Act, the Public Utility Commission of Texas shall adopt rules to effectuate the changes in law made by this Act. SECTION 4. This Act takes effect immediately if it receives a vote of two-thirds of all the members elected to each house, as provided by Section 39, Article III, Texas Constitution. If this Act does not receive the vote necessary for immediate effect, this Act takes effect September 1, 2027.